![HKS lazar HTi20 Installation & Operation Manual Download Page 38](http://html1.mh-extra.com/html/hks-lazar/hti20/hti20_installation-and-operation-manual_2141180038.webp)
Figure 27. Heat pump
1 – Evaporator; 2 - Casing; 3 – Compressor chamber
7.5.
Inspection
User shall notify the manufacturer about his readiness to perform a period inspection. Any periodic inspection
performer by any person other than HKS LAZAR authorized service voids the guarantee. Costs related to an
annual inspection shall be incurred by the user according to HKS LAZAR price list. The inspection shall be
performed every year on regular basis during device operation, counting from date of pre-commissioning.
Inspection shall be performed every year, no more often than every 8 months and no more less than every 14
months. System components shall undergo an annual check performed by HKS Lazar service engineer including
cleaning, if required. Regular check regarding possible contamination and cleaning, if required shall be
performed of air inlet and outlet (interval depends on device location). Also check is required of condensate
drain regarding blockage to ensure unrestricted condensate outflow. Note that temperature below freezing point
and high air humidity may result in icing. Remove icing to ensure heat pump proper operation! No not use
agents to accelerate defrosting.
Operation Manual and Guarantee Card v.010
HKS LAZAR Sp.z o.o. ul. Wodzisławska 15B 44-335 Jastrzębie-Zdrój
page.
38