![HKS lazar HTi20 Installation & Operation Manual Download Page 14](http://html1.mh-extra.com/html/hks-lazar/hti20/hti20_installation-and-operation-manual_2141180014.webp)
5.2.
Installation of flat roof
Heat pump may be installed on the flat roof, however the following shall be taken into account.
Always an unrestricted access shall be ensured to the heat pump. During any works related to the device, the
hazardous zone shall be provided within 2m from device, plus a required distance. No person is allowed within
the hazardous zone. If not possible, note to install equipment protecting against fall, e.g. a barrier withstanding
loading. Alternately the device protecting against fall shall be provided, e.g. scaffolding or fall protection cover.
Always keep safe distance from roof opening and flat roof windows. During works protect roof opening and
flat roof windows to prevent a fall e.g. by installing fencing.
5.3.
Internal unit
Heat pump internal module shall be installed inside the building only to prevent exposure to water and humidity,
as well as to ensure an unrestricted access for user and service engineer. Boiler room control panel shall be
installed to the wall in vertical position using expansion plugs.
Note that an unrestricted access is required to ensure reliable and proper operation of control panel.
Figure 9.
Smart internal unit
1 – Control panel, touch screen; 2 – Hot water supply; 3 – Supply from heat pump; 4 –Central heating
supply
Operation Manual and Guarantee Card v.010
HKS LAZAR Sp.z o.o. ul. Wodzisławska 15B 44-335 Jastrzębie-Zdrój
page.
14