MAINTENANCE
7-57
Installing Rubber Crawler
1. Lower the bucket and blade to raise both tracks off
ground. Place blocks under machine frame to support
the machine.
2. Slowly turn valve (1) counterclockwise to allow
grease to escape from the grease outlet.
3. Engage the rubber track with the sprocket and posi-
tion the other end of the rubber track on the front idler.
4. While rotating the sprocket in reverse, apply hori-
zontal force to the rubber track to seat it on the idler.
5. Insert a steel pipe into gaps among lower rollers,
track frame and rubber track and rotate the rubber
track slowly to correctly seat the rubber track on the
idler.
6. Confirm that the rubber track is correctly engaged
with the sprocket and idler.
7. Adjust track sag. (See page 7-54.)
8. After checking that the rubber track is correctly en-
gaged with the sprocket and idler and the track sag is
correctly adjusted, lower the machine to the ground.
M1LA-07-036
M503-07-062
M503-07-063
Direction of Rotation
Steel Pipe
Direction of Rotation
Steel Pipes
2
1
Grease Outlet
Summary of Contents for ZX27U-2
Page 1: ......
Page 8: ...CONTENTS MEMO ...
Page 10: ...MACHINE NUMBERS MEMO ...
Page 44: ...SAFETY SIGNS S 34 SS 259 SS 2684 SS 2652 SS 024 SS 2639 SS3090482 M1M7 07 021 CANOPY CAB ...
Page 50: ...SAFETY SIGNS S 40 MEMO ...
Page 65: ...OPERATOR S STATION 1 15 RADIO Cab Equipped Machines 1 Radio Clock M1M7 01 004 1 ...
Page 74: ...BREAK IN 2 2 MEMO ...
Page 120: ...TRANSPORTING 6 6 MEMO ...
Page 133: ...MAINTENANCE 7 13 6 Swing cylinder 7 Swing post M1M7 07 023 M1M7 07 024 ...
Page 196: ...MAINTENANCE 7 76 MEMO ...
Page 200: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 224: ...SPECIFICATIONS 12 20 MEMO ...
Page 226: ...REFERENCE 13 2 MEMO ...
Page 230: ...INDEX 14 4 MEMO ...