
OPERATING THE MACHINE
5-23
•
When crushing objects in high positions such as a
ceiling, carefully operate the machine so that falling
objects do not come in contact with the machine.
•
Before operating the machine on a floor in a building,
check that the floor is strong enough to support the
machine weight. Depending on type of work the ma-
chine is engaged in, crushing reaction force may be
added to the floor besides the machine weight.
•
Start operation only after the machine is horizontally
parked and the footing is stabilized. Never operate the
machine positioned on stacks of rubble, or inclined
ground.
•
Do not move or load crushed materials using the
crusher.
•
When replacing the crusher with other work tools such
as a bucket or breaker, the hydraulic oil may easily
become contaminated. Change the hydraulic oil and
replace the full flow filter element at the same intervals
as applied to the hydraulic breaker.
•
Before transporting the machine on a trailer, remove
the crusher from the front attachment. Position the
bucket cylinder so that the cylinder is not fully ex-
tended during transportation. (During transportation,
the machine may be raised off the trailer deck floor
due to vibration as mentioned in Step 1, possibly re-
sulting in damage to the front attachment.)
PRECAUTIONS FOR AFTER OPERATING THE
MACHINE
1. After operating the machine, move the machine to a
level, solid ground where no possibility of falling
stones, landslide, or flooding is present. (Refer to the
Parking group in the Driving Machine section.)
2. Fully refill the fuel.
3. Clean the machine.
4. During cold weather season, remove the coolant from
the radiator and the water jacket. Attach “No Coolant”
tag in a visible place.
M107-05-048
M107-05-049
M1M7-05-024
WRONG
WRONG
Summary of Contents for ZX27U-2
Page 1: ......
Page 8: ...CONTENTS MEMO ...
Page 10: ...MACHINE NUMBERS MEMO ...
Page 44: ...SAFETY SIGNS S 34 SS 259 SS 2684 SS 2652 SS 024 SS 2639 SS3090482 M1M7 07 021 CANOPY CAB ...
Page 50: ...SAFETY SIGNS S 40 MEMO ...
Page 65: ...OPERATOR S STATION 1 15 RADIO Cab Equipped Machines 1 Radio Clock M1M7 01 004 1 ...
Page 74: ...BREAK IN 2 2 MEMO ...
Page 120: ...TRANSPORTING 6 6 MEMO ...
Page 133: ...MAINTENANCE 7 13 6 Swing cylinder 7 Swing post M1M7 07 023 M1M7 07 024 ...
Page 196: ...MAINTENANCE 7 76 MEMO ...
Page 200: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 224: ...SPECIFICATIONS 12 20 MEMO ...
Page 226: ...REFERENCE 13 2 MEMO ...
Page 230: ...INDEX 14 4 MEMO ...