MAINTENANCE
7-2
PREPARE MACHINE FOR
INSPECTION/MAINTENANCE
Before performing inspection/maintenance of the machine,
park the machine as described below unless otherwise
specified.
1. Park the machine on a solid level surface.
2. Lower the working tools such as the bucket and/or
blade to the ground.
3. Turn the auto-idle switch OFF. (Except ZX27U
-2
)
4. Run the engine at slow idle speed without load for
approx. 5 minutes to cool down the engine.
5. Turn the key switch OFF. Remove the key from the
switch. If inspection/maintenance must be performed
with the engine running, be sure to place a lookout to
prevent the machine from being operated mistakenly
by other personnel.
6. Be sure to place pilot control shut-off lever (1) in the
LOCK position.
7. Attach an “UNDER INSPECTION/MAINTENANCE”
tag to a visible place such as the cab door or one of
the control levers.
M1M7-05-024
M1M7-03-001
1
Summary of Contents for ZX27U-2
Page 1: ......
Page 8: ...CONTENTS MEMO ...
Page 10: ...MACHINE NUMBERS MEMO ...
Page 44: ...SAFETY SIGNS S 34 SS 259 SS 2684 SS 2652 SS 024 SS 2639 SS3090482 M1M7 07 021 CANOPY CAB ...
Page 50: ...SAFETY SIGNS S 40 MEMO ...
Page 65: ...OPERATOR S STATION 1 15 RADIO Cab Equipped Machines 1 Radio Clock M1M7 01 004 1 ...
Page 74: ...BREAK IN 2 2 MEMO ...
Page 120: ...TRANSPORTING 6 6 MEMO ...
Page 133: ...MAINTENANCE 7 13 6 Swing cylinder 7 Swing post M1M7 07 023 M1M7 07 024 ...
Page 196: ...MAINTENANCE 7 76 MEMO ...
Page 200: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 224: ...SPECIFICATIONS 12 20 MEMO ...
Page 226: ...REFERENCE 13 2 MEMO ...
Page 230: ...INDEX 14 4 MEMO ...