S-10
SAFETY
Investigate Job Site Beforehand
When working at the edge of an excavation or on a road
shoulder, the machine could tip over, possibly resulting in
serious injury or death.
Investigate the configuration and ground conditions of
the job site beforehand to prevent the machine from
falling and to prevent the ground, stockpiles, or banks
from collapsing.
Make a work plan. Use machines appropriate to the work
and job site.
Reinforce ground, edges, and road shoulders as
necessary. Keep the machine well back from the edges of
excavations and road shoulders.
When working on an incline or on a road shoulder,
employ a signal person as required.
Confirm that your machine is equipped with a FOPS cab
before working in areas where the possibility of falling
stones or debris exist.
When the footing is weak, reinforce the ground before
starting work.
When working on frozen ground, be extremely alert. As
ambient temperatures rise, footing becomes loose and
slippery.
Beware of the possibility of fire when operating the
machine near flammable objects such as dry grass.
SA-447
Summary of Contents for ZW 180-6
Page 4: ......
Page 10: ...CONTENTS MEMO ...
Page 52: ...S 40_70Z7B S 40 SAFETY LABELS 1 24 12 11 18 23 9 1 9 14 22 14 15 21 17 16 Battery Top 20 ...
Page 62: ...S 50 SAFETY LABELS MEMO ...
Page 204: ...2 2 BREAK IN MEMO ...
Page 238: ...4 20 MOVING THE MACHINE MEMO ...
Page 277: ...7 5 MAINTENANCE MEMO ...
Page 404: ...MAINTENANCE 7 132 MEMO ...
Page 408: ...9 4 MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS MEMO ...
Page 412: ...10 4 STORAGE MEMO ...
Page 418: ...12 2 SPECIFICATIONS MEMO ...
Page 426: ...14 6 INDEX MEMO ...