MAINTENANCE
7-22
5. One point each to right and left lift arm cylinder rod pins
(7).
--- every 500 hours (250 hours at first time only)
One point each to right and left lift cylinder pins (8).
--- every 500 hours (250 hours at first time only)
6. One point each to right and left lift arm pivot pins (9).
--- every 500 hours (250 hours at first time only)
7. One point each to front right and left steering cylinder
pins (10 and 11).
--- every 500 hours (250 hours at first time only)
10- Cylinder right front
11- Cylinder left front
9
8
7
10 11
MNSC-07-001
MNSC-07-002
Summary of Contents for ZW 120-6
Page 4: ......
Page 10: ...MACHINE NUMBERS 2 MEMO ...
Page 58: ...SAFETY SIGNS S 48 MEMO ...
Page 156: ...BREAK IN 2 2 MEMO ...
Page 206: ...OPERATING MACHINE 5 20 MEMO ...
Page 218: ...TRANSPORTING 6 12 MEMO ...
Page 331: ...MAINTENANCE 7 113 25 Cutting edge mounting bolt Bolt dia in 1 Quantity 7 M4GB 07 116 ...
Page 344: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO ...
Page 348: ...STORAGE 10 4 MEMO ...
Page 354: ...TROUBLESHOOTING 11 6 MEMO ...
Page 356: ...SPECIFICATIONS 12 2 MEMO ...
Page 360: ...13 4 OPTIONAL ATTACHMENTS HYDRAULIC TYPE QUICK COUPLER OPERATION MEMO ...