MAINTENANCE
7-21
A. Greasing
d
WARNING: Apply the parking brake and the
articulation lock bar.
f
NOTE:
Until break-in operation is performed for more than
50 hours, lubricate the machine every day to get initial
operational concordance.
In case excavation is made in mud, water or snow, lubricate
the machine after operation is complete.
Sufficiently add high quality grease through the grease
fittings. After removing contamination around the grease
fitting, add grease. After greasing, thoroughly remove the
old grease that was pushed-out from the seals.
1. One point each to right and left bucket pins (1).
--- every 500 hours (250 hours at first time only)
2. One point each to bucket link pins (2 and 3).
--- every 500 hours (250 hours at first time only)
3. One point to bucket cylinder rod pin (4).
--- every 500 hours (250 hours at first time only)
One point to bucket cylinder pin (5).
--- every 500 hours (250 hours at first time only)
4. One point to bell crank pin (6).
--- every 500 hours (250 hours at first time only)
4
2
1
3
5
6
MNSC-07-001
MNSC-07-002
MNSC-07-050
Summary of Contents for ZW 120-6
Page 4: ......
Page 10: ...MACHINE NUMBERS 2 MEMO ...
Page 58: ...SAFETY SIGNS S 48 MEMO ...
Page 156: ...BREAK IN 2 2 MEMO ...
Page 206: ...OPERATING MACHINE 5 20 MEMO ...
Page 218: ...TRANSPORTING 6 12 MEMO ...
Page 331: ...MAINTENANCE 7 113 25 Cutting edge mounting bolt Bolt dia in 1 Quantity 7 M4GB 07 116 ...
Page 344: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO ...
Page 348: ...STORAGE 10 4 MEMO ...
Page 354: ...TROUBLESHOOTING 11 6 MEMO ...
Page 356: ...SPECIFICATIONS 12 2 MEMO ...
Page 360: ...13 4 OPTIONAL ATTACHMENTS HYDRAULIC TYPE QUICK COUPLER OPERATION MEMO ...