2-1
BREAK-IN
Break-in Operation for New Machine
IMPORTANT: If the machine is heavily loaded without
performing break-in operation, damage to the
machine such as seizure and/or scoring may result by
which the machine life will be remarkably shortened.
Be sure to sufficiently perform break-in operation.
Machine life and performance will be greatly affected by the
extent of operation and maintenance of the machine during
the initial operation. Perform break-in operation for the first
100 hours.
Check the machine before starting the engine.
After starting the engine, sufficiently perform warm up
operation.
Avoid sudden starting, sudden acceleration and sudden
braking while traveling the machine.
Avoid heavy load for the front attachment.
Summary of Contents for ZW 120-6
Page 4: ......
Page 10: ...MACHINE NUMBERS 2 MEMO ...
Page 58: ...SAFETY SIGNS S 48 MEMO ...
Page 156: ...BREAK IN 2 2 MEMO ...
Page 206: ...OPERATING MACHINE 5 20 MEMO ...
Page 218: ...TRANSPORTING 6 12 MEMO ...
Page 331: ...MAINTENANCE 7 113 25 Cutting edge mounting bolt Bolt dia in 1 Quantity 7 M4GB 07 116 ...
Page 344: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO ...
Page 348: ...STORAGE 10 4 MEMO ...
Page 354: ...TROUBLESHOOTING 11 6 MEMO ...
Page 356: ...SPECIFICATIONS 12 2 MEMO ...
Page 360: ...13 4 OPTIONAL ATTACHMENTS HYDRAULIC TYPE QUICK COUPLER OPERATION MEMO ...