
– 50 –
MODEL RAM-130QH5
Expansion valves
The expansion valves are initialized when power is supplied. The valve for unit 1 is fully closed (–520
pulses), and then that for unit 2 is fully opened (480 pulses). The valve for unit 2 is fully closed (–520
pulses), and then that for unit 3 is fully opened (480 pulses). When the valve for unit 1, 2, 3 is fully
closed (0 pulse), start-up is possible.
The start openings are held during the steady speed period when the compressor is started. After the
steady speed period is finished, the TD control is entered. The start openings are set to PSTARTH when
the outdoor temperature at start 40˚C or more, and to PSTART when it is less than 40˚C.
This unit contain 2 separated refrigerant cycle. The explaination on expansion Valve for unit 1, 2 and 3 is for one
refrigerant cycle, which is the Upper Side of the unit. And for the second refrigerant cycle which is the lower side of
the unit, the explaination of expansion valve for unit 4, 5 and 6 shall be the same as unit 1, 2, and 3
Also, this 2 refrigerant cycles are controlled by totally separated eletrical assembly with 2 separated micon.
Compressor rotation speed
When the compressor is started, the SDRCT1 speed / TSTKTM1 second is held.
After the steady speed period is finished, the speed increases at the rate of SDSTEP speed / TSKSPT
second until the target speed is resched.
Power
Heating output
Cooling output
Compressor
rotation speed
Unit 1/4
Unit 2/5
Hold
Hold
Hold 500ms
Hold 500ms
Hold 500ms
Hold
Hold
Hold
Hold
PSTARTC2$
PSTARTC2$
Initialization finished
PSTARTC2$
PSTARTC2K$
< TD control + N correction + distribution control >
31.25pps
Start enabled
approx. 100ms
Start sequence
SDSTEP min
-1
/TSKSPT
sec.
CMAX2
Cooling
Cooling
Cooling
100ms
1s
1s
1s
Unit 3/6
520
480
0
520
480
0
520
480
0
Outdoor fan
Turns on
for cooling
Turns on
for heating
Operation
Power
Rush-in
prevention
Compressor
P
o
w
e
r rela
y
Expansion v
a
lv
e
Re
versing
va
lv
e
Unit 1/4
Unit 2/5
Unit 3/6
Outdoor temperature
≥
40˚C
PSTARTC2K$
Outdoor temperature
≥
40˚C
TSKTMI_C1
Outdoor temperature
≥
STARCTP_C
TSKTMI_C2
Outdoor temperature
≤
STARCTP_C
SDRCTI_C1
Outdoor temperature
≥
STARCTP_C
SDRCTI_C2
Outdoor temperature
≤
STARCTP_C
PSTARTC2K$
Outdoor temperature
≥
40˚C
< TD control + N correction + distribution control >
< TD control + N correction + distribution control >
TSKTM1, SDRCT1, SDSTEP, TSKSPT, CMAX2, PSTART and PSTARTH are EEPROM data.
Summary of Contents for RAM-130QH5
Page 10: ... 11 SIX ROOM SYSTEM MULTI R A C RAM 130QH5 CONNECTING POSISION TO BE ABLE TO INSTALL ...
Page 20: ... 22 CAPACITY DIAGRAM RELATED TO THE PIPING LENGTH MODEL RAM 130QH5 ...
Page 25: ... 29 6V01 ...
Page 26: ... 31 ...
Page 28: ... 35 ...
Page 33: ... 41 Outdoortemperature STAROTP_C TSKTM1_C1 Outdoortemperature STAROTP_C TSKTM1_C2 ...
Page 34: ... 43 ...
Page 35: ... 45 ...
Page 36: ... 47 ...
Page 37: ... 49 ...
Page 47: ... 59 5A ...
Page 54: ... 66 ...
Page 55: ... 67 5 Reversing valve control circuit Fig 5 1 ...
Page 77: ... 92 TROUBLESHOOTING OF THE SYSTEM POWER MODULE ...
Page 78: ... 93 ...
Page 79: ... 94 ...
Page 83: ... 98 ...
Page 84: ...HITACHI PM NO 0000 Printed in Malaysia RAM 130QH5 ...