4 OPERATION
4-9
(4) For Ethernet communication, click the “Ethernet” radio button and then enter the connection
destination “IP address.” (See Figure 4-6.)
Figure 4-6 Ethernet Connection
(5) After completion of setup, click the OK button. To abort the setup process, click the
Cancel button.
NOTICE
z
The S10mini Series does not support GP-IB. Do not select “GPIB” on the
communication type selection window.
z
The S10V Series does not support GP-IB. “GPIB” is not displayed on the
communication type selection window.
4.2.5 Closing the system
In the [IR.LINK SYSTEM] window (see Figure 4-2) or [ [S10V] IR.LINK SYSTEM] window
(see Figure 4-3), click the
×
button or Close button.
Summary of Contents for IR.LINK
Page 1: ......
Page 2: ......
Page 15: ...This Page Intentionally Left Blank ...
Page 25: ...This Page Intentionally Left Blank ...
Page 26: ...1 SPECIFICATIONS ...
Page 30: ...2 NAMES AND FUNCTIONS OF EACH PART ...
Page 33: ...This Page Intentionally Left Blank ...
Page 34: ...3 MOUNTING AND WIRING ...
Page 43: ...This Page Intentionally Left Blank ...
Page 44: ...4 OPERATION ...
Page 68: ...5 USER GUIDE ...
Page 86: ...6 MAINTENANCE ...