2. Set the voltage selector switch to appropriate setting based on the onsite supply
voltage connected to the storage system and SVP3.
■
If the onsite supply voltage is 200V-240V, there is no need to remove the tamper-
proof label as the default setting for the voltage selector switch is 240V. If the
tamper-proof label has been removed, confirm the voltage selector switch
before installing the rail kit.
■
If the onsite supply voltage is 100V-115V, remove the tamper-proof label and set
the voltage selector switch to 115V before installing the rail kit.
Caution: The voltage selector switch has a tamper-proof label covering
the switch set to the default 230V setting. If this label has been removed,
you must confirm the switch setting before installing the rail kit.
Installing the inner rail extension
The SVP3 contains a rack rail assembly that must be separated into inner and outer rail
extensions. The inner rail extension attaches directly to the SVP3 while the outer rail
extension attaches directly to the rack.
Before you begin
■
Confirm that the voltage selector switch is set to the same voltage as the onsite
supply voltage connected to the storage system.
Procedure
1. Remove the eight screws on the right and left rail extensions, and then separate the
inner and outer rail extensions on both sides.
Installing the inner rail extension
Chapter 3: Installing the SVP3
Service Processor 3 (SVP3) Technical Reference