![HIOS BLOP-STC 3 Operation Manual Download Page 20](http://html1.mh-extra.com/html/hios/blop-stc-3/blop-stc-3_operation-manual_2137591020.webp)
■
Work instructions
1) Turn on the main power switch.
2) Input the set signal
•
The work set timer starts operation.
•
The work set timer stops operation.
•
The valve signal is generated at the same time.
•
Simultaneously, the operating display LED (DRV) is turned on and electric screwdriver
operation is permitted.
3) Finishing of tightening of the first screw.
•
Tighten the first screw.
The number of screws display is lowered by one.
4) After tightening the set number of screws, tightening of screws is finished.
•
The number of screws display changes to “00” and the work reset timer operation
starts.
•
Next the work reset timer operation stops.
•
The valve signal output stops at the same time.
•
Simultaneously, the operating display LED (DRV) is turned off and electric screwdriver
operation is prevented.
•
The completion buzzer turns off at the same time.
•
The COMP signal is generated for 0.1 second.
5) Next, the unit changes to standby until the set signal is input.
6) The above is repeated.
7) Work is completed.
- 19 -
Summary of Contents for BLOP-STC 3
Page 14: ...Function Setting Table 13...