
Electrically Operated General Ward Bed
Page 4 - 1
Operation and Maintenance Manual
(154588 REV 1)
4
Chapter 4
Removal, Replacement, and
Adjustment Procedures
Tool and Supply Requirements
To service the Electrically Operated General Ward Bed, these tools and
supplies are necessary:
• #2 phillips screwdriver
• 11 mm hex wrench
• 11 mm spanner wrench
• 13 mm spanner wrench
• 17 mm spanner wrench
• 18 mm drive socket
• 3/16" punch
• 3/4" drive socket
• 5/32" hex wrench
• Bed stands
• Bed jacks
• Hammer
• Pliers
• Screwdriver