During a Test Stage, the screen changes to show that high voltage is On, shows the start voltage and
rate of rise, duration of the test so far, and the voltage, as shown in Figure 4-9.
1.0kV/s > BREAKDOWN
30.7
Test Program Name
Count up Timer for current stage duration
Rate of rise from 0kV to breakdown
System Messages
kV
STAGE
1
HV on
Current Stage/ High Voltage ON Indicator
TEST:ASTM-D1816/84
TIMER:00:00:30
12:10 01/08/16 65°F
Figure 4-9 –
Test Stage during voltage ramp
If the system detects a breakdown, it will display the event, Figure 4-10, and the test will proceed will
proceed according to the chosen Standard.
AFTER BD WAIT TIMER...
42.2
Test Program Name
Count Down Timer for post breakdown wait
System Messages
kV
Current Stage Number
STAGE
1
Blinking Breakdown Indicator
STIR
TEST:ASTM-D1816/84
TIMER:00:01:00
12:10 01/08/16 65°F
Stage Message - we are waiting to start next stage
Figure 4-10 –
After Breakdown Wait period