66
Ground Loops Specifications
#
Group
Test or Verify
Test Methods and
Expected Results
Pass /
Fail
Comments
To control the illumination
intensity, right-click and
change levels.
The test should be done
against a reflecting plate.
Camera is looking towards
the middle of the loop.
Video quality is good.
Smooth video stream with
no noise.
All illumination intensities
work properly.
6
Network
Net client connectivity
Write in the configure
section net client (checked)
for enable add IP number
(1368 is our default) restart
and check in data center the
IP is connected.
Summary of Contents for C5
Page 1: ...C5 Installation and Operation Guide Version 1 2 February 2010 ...
Page 2: ... Copyright 2009 Hi Tech Solutions Inc ...
Page 6: ......
Page 12: ......
Page 16: ......
Page 28: ......
Page 38: ......
Page 45: ...C5 Installation and Operation Guide Viewing and Changing the C5 Configuration File 43 ...
Page 46: ......
Page 52: ......
Page 56: ...54 Ground Loops Specifications ...
Page 57: ...C5 Installation and Operation Guide Equipment Specifications Data sheets 55 ...
Page 58: ...56 Ground Loops Specifications ...
Page 59: ...C5 Installation and Operation Guide Equipment Specifications Data sheets 57 ...
Page 60: ...58 Ground Loops Specifications ...
Page 61: ...C5 Installation and Operation Guide Equipment Specifications Data sheets 59 ...
Page 64: ......
Page 66: ......
Page 70: ......