28. Extend the mid-rails out of the rack so that they are protruding from the front of the rack and the safety
latches engage.
Figure 140: Extend Mid-Rails
29. Install the chassis into the rails.
a)
Caution:
This step in the installation requires a minimum of 3 individuals to install safely,
two to lift and one to guide the others whom may have difficulty seeing because the enclosure
is in the way. Ensure that the appropriate measures are taken to safely support the enclosure
during installation. The enclosure MUST have no drives installed and requires a two person
team lift to install. Do not attempt to lift the system if it is fully populated with drives. The
only case in which the system may be installed or removed with the drives populated is if the
facility has a lift that is rated to handle the maximum weight of the fully loaded system.
Warning:
The handles on the front of the chassis are not intended to be used to support
the weight of the Ultrastar Data60. Lifting the unit by the chassis handles or trying to support
the unit on the handles can cause them to fail. This can cause serious damage to the unit or
serious bodily harm to those handling the unit. Always team lift the chassis by gripping the
underside of the unit, and never try to lift a chassis that is filled with drives.
Warning:
Do not lift the chassis by the Cable Tray while removing the chassis from the
rack OR while installing it into a rack. This can cause serious damage to the unit or serious
125
4
Part Replacement
User Guide
4.9
Chassis Replacement