2-6 NORMAL OPERATION PROCEDURE
2-6-1 PROCEDURE OF TURNING ON MACHINE
1.
TURN ON THE EXTERNAL POWER
SUPPLY.
2.
Turn on the power switch on control panel.
(“ON” position)
3.
Check the hot melt adhesive inside tank is
enough or not, if necessary, please load enough
adhesive into tank.
4.
Check all the temperature on temperature
controller is correct. If they are not the required
temperature, please re-set the temperature.
5. Turn on the motor by pressing the “START”
button on the control panel after all temperature of
each area have reached the setting value and the
adhesive in the tank has been melt completely.
Summary of Contents for HS1102S
Page 1: ......
Page 23: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 22 ...
Page 24: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 23 ...
Page 25: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 24 ...
Page 26: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 25 ...
Page 27: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 26 ...
Page 28: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 27 ...
Page 29: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 28 ...
Page 30: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 29 ...
Page 31: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 30 ...
Page 32: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 31 ...
Page 33: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 32 ...
Page 34: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 33 ...
Page 35: ...Hwang Sun Enterprise Co Ltd Edition 2012 06 34 ...