4. SAFETY INSTRUCTIONS
4.1 General Safety
Solar modules should only be used for the purposes for which they are intended (see
module installation for further details). All works on the PV system, i.e. installation,
commissioning, servicing and repairs, should be carried out by qualified and authorized
personnel only. During installation, all local and national electrical and building regulations,
health and safety regulations and accident prevention regulations should be strictly followed.
All protective measures regarding working at heights and preventing falls specified in
national and local health and safety codes and regulations should be implemented before and
during all work on roof-mounted and other PV array structures, and all necessary scaffolding
and other protective measures applied at the site of the installation. Protective helmets, gloves
and footwear should be worn during installation work. Protective goggles should be worn when
carrying out drilling, cutting or grinding work. Safety harnesses may be required in some
situations.
Unpacking the modules and storage: Utmost care is required when handling solar electric
modules. Be careful when unpacking, transporting, and storing the modules, they are subject to
breakage if they are not properly handled and installed:
Always transport and store the modules in the shipping container provided. Transport
modules in an upright position. It is recommended not to take them out of the packaging
until the moment of the installation. During installation, never let the modules in direct
contact on ground, concrete or tiles without intersecting a soft material. Scratches or
glass breakages may occur.
Carry modules always between two workers and with both hands (Do not use the
junction box as a handle).
Do not carry more than one module at a time.
Ensure modules do not bow under their own weight and do not place modules on top of
each other.
Do not drop modules or allow objects to fall on modules.
Do not carry the module by the cables.
Avoid setting the module down hard on any surface. Pay particular attention to the glass
edges.
Don’t mark using sharp tools and keep all electrical contacts clean and dry. Do not
handle modules when they are wet unless wearing the appropriate protective equipment.
Do not install this module integral with a roof or wall without a certified integration
mounting system.
Do not wear metallic jewelry while performing mechanical or electrical installation.
Summary of Contents for HS Atlas Series
Page 1: ...10 SSI 001_rev 005_ENG Page 1 of 51 SAFETY AND INSTALLATION INSTRUCTIONS...
Page 38: ...10 SSI 001_rev 005_ENG Page 38 of 51 Fig 27 Laser marking 2D barcode Fig 28 Module label...
Page 43: ...10 SSI 001_rev 005_ENG Page 43 of 51 12 CERTIFICATES 12 1 Modules...
Page 44: ...10 SSI 001_rev 005_ENG Page 44 of 51...
Page 45: ...10 SSI 001_rev 005_ENG Page 45 of 51...
Page 46: ...10 SSI 001_rev 005_ENG Page 46 of 51...
Page 47: ...10 SSI 001_rev 005_ENG Page 47 of 51 12 2 Junction boxes...
Page 48: ...10 SSI 001_rev 005_ENG Page 48 of 51 12 3 Cables...
Page 49: ...10 SSI 001_rev 005_ENG Page 49 of 51 12 4 Connectors...
Page 50: ...10 SSI 001_rev 005_ENG Page 50 of 51 12 5 Factory Inspection...
Page 51: ...10 SSI 001_rev 005_ENG Page 51 of 51 12 6 Quality Management System...