10-SSI-001_rev.005_ENG
Page
34
of
51
9. PACKAGING AND TRANSPORTATION SPECIFICATIONS
9.1 Storing
PV modules are fragile. Handle with care the transportation box as well as the PV
modules.
Please follow these instructions:
•
Keep the PV module in the transportation box until installation
•
Do not remove stretch film and polyethylene bands before installation
•
Do not stack transportation boxes
•
Keep the transportation box dry
•
Keep the transportation box standing flat. Do not place sideways, upside down or on
inclined surface
•
Keep the transportation box away from vibration or shock
•
When you remove the stretch film and polyethylene bands, empty the transportation box
completely.
•
In case you need to keep a partially filled transportation box, tie the box again with the
polyethylene bands
•
Do not move the box, if a polyethylene band is cut. If cut, tie again before moving
•
When you open the box, keep the PV module away from children
Summary of Contents for HS Atlas Series
Page 1: ...10 SSI 001_rev 005_ENG Page 1 of 51 SAFETY AND INSTALLATION INSTRUCTIONS...
Page 38: ...10 SSI 001_rev 005_ENG Page 38 of 51 Fig 27 Laser marking 2D barcode Fig 28 Module label...
Page 43: ...10 SSI 001_rev 005_ENG Page 43 of 51 12 CERTIFICATES 12 1 Modules...
Page 44: ...10 SSI 001_rev 005_ENG Page 44 of 51...
Page 45: ...10 SSI 001_rev 005_ENG Page 45 of 51...
Page 46: ...10 SSI 001_rev 005_ENG Page 46 of 51...
Page 47: ...10 SSI 001_rev 005_ENG Page 47 of 51 12 2 Junction boxes...
Page 48: ...10 SSI 001_rev 005_ENG Page 48 of 51 12 3 Cables...
Page 49: ...10 SSI 001_rev 005_ENG Page 49 of 51 12 4 Connectors...
Page 50: ...10 SSI 001_rev 005_ENG Page 50 of 51 12 5 Factory Inspection...
Page 51: ...10 SSI 001_rev 005_ENG Page 51 of 51 12 6 Quality Management System...