10-SSI-001_rev.005_ENG
Page
10
of
51
5. MECHANICAL INSTALLATION
5.1
HS Series
Unpacking the product
Make sure the pallet is placed on a horizontal surface
Remove the modules one-by-one from each side of the box
ATTENTION: Make sure that the modules in the center of the box are the last to be removed
Fig. 1 Unpacking method
The following instructions make reference to three different certified mounting procedures.
X
Summary of Contents for HS Atlas Series
Page 1: ...10 SSI 001_rev 005_ENG Page 1 of 51 SAFETY AND INSTALLATION INSTRUCTIONS...
Page 38: ...10 SSI 001_rev 005_ENG Page 38 of 51 Fig 27 Laser marking 2D barcode Fig 28 Module label...
Page 43: ...10 SSI 001_rev 005_ENG Page 43 of 51 12 CERTIFICATES 12 1 Modules...
Page 44: ...10 SSI 001_rev 005_ENG Page 44 of 51...
Page 45: ...10 SSI 001_rev 005_ENG Page 45 of 51...
Page 46: ...10 SSI 001_rev 005_ENG Page 46 of 51...
Page 47: ...10 SSI 001_rev 005_ENG Page 47 of 51 12 2 Junction boxes...
Page 48: ...10 SSI 001_rev 005_ENG Page 48 of 51 12 3 Cables...
Page 49: ...10 SSI 001_rev 005_ENG Page 49 of 51 12 4 Connectors...
Page 50: ...10 SSI 001_rev 005_ENG Page 50 of 51 12 5 Factory Inspection...
Page 51: ...10 SSI 001_rev 005_ENG Page 51 of 51 12 6 Quality Management System...