45
Heat & Glo • SL-5F-IFT, SL-7F-IFT Installation Manual • 2638-980 Rev. H • 6/22
D. Disassemble Vent Sections
• Rotate either section (see Figure 7.10) so the seams on
both pipe sections are aligned as shown in Figure 7.11.
• Pull carefully to separate the pieces of pipe.
Figure 7.11 Align and Disassemble Vent Sections
Figure 7.10 Rotate Seams for Disassembly