Heat & Glo • SL-5F-IFT, SL-7F-IFT Installation Manual • 2638-980 Rev. H • 6/22
2
Safety Alert Key:
• DANGER!
Indicates a hazardous situation which, if not avoided
will
result in death or serious injury.
• WARNING!
Indicates a hazardous situation which, if not avoided
could
result in death or serious injury.
• CAUTION!
Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
• NOTICE:
Used to address practices not related to personal injury.
Note:
The term “recommend” or “recommended” does not indicate a requirement. It is a best practice suggested by
Hearth & Home Technologies
®
.
Table of Contents
Installation Standard Work Checklist . . . . . . . . . . . . . . . . . . . .
3
1 Product Specific and Important Safety Information
A. Appliance Certification . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
B. Glass Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
C. BTU Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
D. High Altitude Installations . . . . . . . . . . . . . . . . . . . . . . . . . .
4
E. Non-Combustible Materials Specification. . . . . . . . . . . . . .
5
F. Combustible Materials Specification . . . . . . . . . . . . . . . . .
5
G. Electrical Codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5
H. California . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5
I. Requirements for the Commonwealth of Massachusetts . .
6
2 Getting Started
A. Design and Installation Considerations . . . . . . . . . . . . . . .
7
B. Good Faith Wall Surface . . . . . . . . . . . . . . . . . . . . . . . . . .
7
C. Tools and Supplies Needed . . . . . . . . . . . . . . . . . . . . . . . .
7
D. Inspect Appliance and Components . . . . . . . . . . . . . . . . . .
8
3 Framing and Clearances
A. Appliance/Decorative Barrier Front Dimension Diagrams .
9
B. Appliance Location and Clearances to Combustibles . . .
12
C. Constructing the Appliance Chase . . . . . . . . . . . . . . . . . .
14
D. Floor Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
14
4 Termination Location and Vent Information
A. Approved Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15
B. Vent Termination Minimum Clearances . . . . . . . . . . . . . .
15
C. Vent Terminal Clearances . . . . . . . . . . . . . . . . . . . . . . . .
17
D. Use of Elbows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18
E. Use of Flex Vent (SLP-FLEX Series 6-5/8 Inch) . . . . . . .
19
F. Vent Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20
5 Vent Clearances and Vent Framing
A. Vent Clearances to Combustibles . . . . . . . . . . . . . . . . . .
34
B. Wall Penetration Framing/Firestops . . . . . . . . . . . . . . . . .
35
C. Ceiling Firestop/Floor Penetration Framing . . . . . . . . . . .
36
D. Install Attic Insulation Shield . . . . . . . . . . . . . . . . . . . . . . .
36
6 Appliance Preparation
A. Vent Collar Preparation . . . . . . . . . . . . . . . . . . . . . . . . . .
37
B. Prepare For Heat Management . . . . . . . . . . . . . . . . . . . .
40
C. Securing and Leveling the Appliance . . . . . . . . . . . . . . . .
41
7 Venting
A. Assemble Vent Sections (DVP Pipe Only) . . . . . . . . . . . .
42
B. Assemble Slip Sections . . . . . . . . . . . . . . . . . . . . . . . . . .
44
C. Secure the Vent Sections . . . . . . . . . . . . . . . . . . . . . . . . .
44
D. Disassemble Vent Sections . . . . . . . . . . . . . . . . . . . . . . .
45
E. Vertical Termination Requirements . . . . . . . . . . . . . . . . . .
46
F. Horizontal Termination Requirements . . . . . . . . . . . . . . .
47
8 Electrical Information
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
49
B. Wiring Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . .
51
9 Gas Information
A. Fuel Conversion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
53
B. Gas Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
53
C. Gas Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
53
D. High Altitude Installations . . . . . . . . . . . . . . . . . . . . . . . . .
53
E. Air Shutter Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
54
10 Finishing
A. Facing Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
55
B. Installing a Television . . . . . . . . . . . . . . . . . . . . . . . . . . . .
55
C. Mantel and Wall Projections . . . . . . . . . . . . . . . . . . . . . . .
56
D. Install Decorative Barrier Front/Hood . . . . . . . . . . . . . . . .
58
11 Appliance Setup
A. Remove the Shipping Materials . . . . . . . . . . . . . . . . . . . .
59
B. Clean the Appliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
59
C. Install the Optional Refractory Kit . . . . . . . . . . . . . . . . . . .
59
D. Install the Log Assembly. . . . . . . . . . . . . . . . . . . . . . . . . .
60
E. IntelliFire Touch
®
Control System Setup . . . . . . . . . . . . .
67
F. Fixed Glass Assembly Removal and Replacement . . . . .
67
G. Install Decorative Barrier Front. . . . . . . . . . . . . . . . . . . . .
68
H. Install Optional Trim Kits. . . . . . . . . . . . . . . . . . . . . . . . . .
68
12 Reference Materials
A. Vent Components Diagrams . . . . . . . . . . . . . . . . . . . . . .
69
B. Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
81
= Contains updated information.