background image

35

 2" Nails

(5,1 cm)

AUR

AUL

Flush

Flush to top
of panel

Fig. A

Flush

Roof Panel

PARTS REQUIRED:

GABLE TRIM

x48

2" (5,1 cm)

Your gable trim is now installed.

Install front gable trim 

AUR

 and 

AUL

 fl ush to top of roof panel and fl ush at peak, as shown 

(Fig. A)

.

Secure trim with 2" fi nishing nails 7-1/4" apart. 

BEGIN

1

Repeat above steps to secure the back wall gable trim.

FINISH

19/32" x 3-1/2" x 71-15/16" (1,5 x 8,9 x 182,7 cm)

x2

AUR

19/32" x 3-1/2" x 71-15/16" (1,5 x 8,9 x 182,7 cm)

x2

AUL

Summary of Contents for 16615-G

Page 1: ...EAM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based on number of completed installations Call a Recruiter Today 734 365 7000 visit us online at help backyardproducts com AVOID THE WAIT Submit a help request Answers to frequently asked questions Live ...

Page 2: ...DC Puerto Rico 18 or older to participate Taxes on prize are responsibility of winner Odds of winning depend on the number of eligible reviews received Void where prohibited For complete details and official rules visit https backyardreviews net sweepstakes rules Scan QR code above Click write a review Find your product Tell us what you think Submit your review You ll be notified by e mail if you ...

Page 3: ...LDING RESTRICTIONS AND APPROVALS Be sure to check local building department and homeowners association for specific restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials t...

Page 4: ... assembly or installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Caulk G...

Page 5: ...frame by adding additional floor joists shown below as shaded Below is a list of additional materials not included x3 x12 2 x 4 x 10 5 1 x 10 2 x 304 8 cm Treated Lumber cut to 2 x 4 x 117 5 1 x 10 2 x 297 2 cm 3 7 6 cm hot dipped galvanized nails Optional 12 30 5 cm spacing Standard 16 40 5 cm spacing Hot Dipped Galvanized Box Type Nails 3 7 6 cm x40 Use only wood treated for ground contact and f...

Page 6: ...S DRIP EDGE AND FELT 3 TAB SHINGLES Bundles 6 PAINT FOR SIDING Gallons 3 Use 100 acrylic latex exterior paint 1 GALVANIZED ROOFING NAILS lbs 3 For shingles PAINT FOR TRIM 1 Quart Use 100 acrylic latex exterior paint CAULK 3 Tubes Use acrylic latex exterior caulk that is paintable 2 coats recommended DRIP EDGE Feet 60 15 ROOFING FELT Sq ft to cover 168 1 GALVANIZED ROOFING NAILS lbs For roofing fel...

Page 7: ...153 7 cm AV x1 7 16 x 3 1 4 x 66 3 4 1 1 x 8 3 x 170 2 cm OSB x2 2 x 4 x 68 5 1 x 10 2 x 172 7 cm UM x4 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA x1 2 x 4 x 72 5 1 x 10 2 x 182 9 cm TM x22 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x3 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 cm TJ x6 2 x 4 x 96 5 1 x 10 2 x 243 9 cm TP x2 2 x 6 x 96 5 1 x 15 3 x 243 9 cm VX 2 x 4 x 65 5 1 x 10 2 x 165 1 cm x14 AD 19 32 x 3 1 2...

Page 8: ...s are 7 16 1 1 cm thick Loft panels are 7 16 1 1 cm thick x2 x2 48 x 96 121 9 x 243 8 cm 23 1 2 x 96 59 7 x 243 8 cm x1 15 7 8 x 36 40 3 x 91 4 cm PANEL DOORS PARTS x1 x1 x2 3 8 x 23 9 16 x 48 1 x 59 9 x 121 9 cm ROOF PANELS x2 x2 23 1 2 x 47 7 8 59 7 x 121 9 cm 47 7 8 x 48 121 6 x 121 9 cm LOFT PARTS x1 36 x 96 91 4 x 243 8 cm 2 x 3 x 96 5 1 x 7 6 x 243 8 cm x1 PT 2 x 4 x 96 5 1 x 10 2 x 243 8 cm...

Page 9: ... 5 x 7 6 x 60 6 cm x1 BC 1 x 3 x 23 78 2 5 x 7 6 x 60 6 cm x1 BC 2 x 3 x 19 5 1 x 7 6 x 48 3 cm x6 LR 1 x 4 x 23 78 2 5 x 10 2 x 60 6 cm x1 JS 1 x 3 x 96 2 5 x 7 6 x 243 9 cm x1 BE 1 x 3 x 96 2 5 x 7 6 x 243 9 cm x1 BE 1 x 4 x 96 2 5 x 10 2 x 243 9 cm x1 KP 1 x 4 x 96 2 5 x 10 2 x 243 9 cm x1 KP Shelf panels are 7 16 1 1 cm thick NOTE If you are using a nail gun nails may be used where screws are ...

Page 10: ... 53 3 cm x1 BWR x2 19 32 x 2 1 2 x 26 5 8 1 5 x 7 6 x 67 6 cm AH x4 3 4 1 9 cm x12 64 Metal Threshold x1 Other HARDWARE Not Actual Size x1 1 1 2 3 8 cm x2 x2 x2 3 4 1 9 cm x8 x8 x1 19 32 x 3 x 8 1 2 1 5 x 7 6 x 21 6 cm x4 DF x2 19 32 x 2 1 2 x 28 1 8 1 5 x 7 6 x 71 4 cm DT NAIL BOXES Shown Actual Size 3 7 6 cm 2 5 1 cm x5 BOXES x6 BOXES ...

Page 11: ... seams with caulk Use a high quality exterior grade caulk beneath all sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements 144 365 8 cm 117 297 2 cm 10 x 12 304 8 x 365 8 cm 10 x12 304 8 x 365 8 cm 120 304 8 cm 187 7 16 476 1 cm Treated Sill Plate Caulk between sill plate and concrete...

Page 12: ...er use shingles in direct contact with ground For best results and aiding in water drainage use gravel under each concrete block LEVELING METHODS MATERIAL REQUIRED 4 x 4 x 12 10 2 x 10 2 x 305 cm Treated Lumber x3 Use only wood treated for ground contact and fasteners approved for use with treated wood Always support frame seams Leveling higher than 16 not recommended LEVELING MATERIALS Gravel 2x4...

Page 13: ...ner Fig A 10 x 12 12 30 5 cm 12 30 5 cm First secure at ends with one fastener Fig B 187 7 16 476 1 cm 187 7 16 476 1 cm LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking it is important to level and square the floor frame A level and square floor frame is required to correctly construct your shed 2 BEGIN 1 Use a level and ensure the frame is level before applying floor panels Check for f...

Page 14: ...after installing floor panels Re level if needed The floor should used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls HINT EAVE WALL EAVE WALL EAVE WALL GABLE WALL GABLE WALL ...

Page 15: ...d on flat surface flush in middle Center OSB on top of AM Fasten together with 3 nails in the pattern shown Your door header is now assembled FINISH OSB ASSEMBLED END VIEW BEGIN 1 AM AM 2 Flip header assembly over and nail as shown on the other side Flush Flush Assemble this door header before building any walls Any wall with a door will require this assembly ...

Page 16: ...pposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails Fig B 3 4 Gauge Block x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm For squareness maintain 3 4 and 1 1 2 measurement along panel edge BEGIN HERE 3 4 1 9 cm 6 15 2 cm 12 30 5 cm 2x3 TEMP SPACER 3 4 GAUGE BLOCK GAA WALL PANEL INSTALLATION HINTS E...

Page 17: ...Pre Assembled Header on flat side Fig A Secure parts with 2 3 nails at each connection Fasten 3 middle parts AL to Pre Assembled Header with 2 3 screws Fig B Secure parts AL to top plates with 2 3 nails at each connection and 4 3 nails at seam 64 162 6 cm AO AO AV AJ BG PARTS REQUIRED 12 FRONT WALL 3 7 6 cm x80 3 7 6 cm x6 x1 Pre Assembled Header x5 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x5 2 x 4...

Page 18: ...OO as a temporary brace Secure with with 2 3 screws Secure panel with 2 nails spaced 6 apart on edges 2x4 Flush Flush 4 3 64 162 6 cm Install 48 x 84 window cutout panel flush to installed panel and 1 1 2 from the top plate Secure panel with 2 nails spaced 6 apart on edges and 12 apart inside panel 5 Your 12 front wall is now assembled Carefully flip the wall over FINISH BEGIN HERE 3 4 1 9 cm 1 1 ...

Page 19: ... x 96 5 1 x 10 2 x 243 8 cm TP 24 61 cm 24 61 cm 24 61 cm 1 1 2 3 8 cm 72 182 9 cm 96 234 8 cm 120 304 8 cm 96 234 8 cm 78 1 2 199 4 cm RL TP RL TP AI x6 48 121 9 cm 1 BEGIN Arrange parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 3 7 6 cm Nails Seam Seam HINT Flush Flush Flush Flush ...

Page 20: ...QUARE EDGE SQUARE EDGE Install 48 x 84 panel 1 1 2 from the top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install the 48 x 84 and 2 23 7 8 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart...

Page 21: ... YFA HVC TJ AI x5 1 BEGIN Orient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 12 BACK WALL 3 7 6 cm x24 x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 cm TJ x5 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI Seam HINT x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC 3 7 6 cm Nails Seam 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA x2 ...

Page 22: ...consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 2 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip edge square edge orientation 3 48 x 84 121 9 x 213 4 cm x3 2x3 2x3 3 1 2 8 9 c...

Page 23: ...21 STANDING YOUR WALLS The following steps show how to stand and secure your walls for a 10 x 12 shed ...

Page 24: ... cm overlap is to the top OO BEGIN 1 1 2 3 8 cm 3 7 6 cm Screws Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to floor with 3 nails Fig A 2 Your 10 wall is now standing FINISH Use OO as a temporary brace Secure with 2 3 screws 6 15 2 cm D O O R D O O R Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig A ...

Page 25: ...e nails into floor frame Fig C Nail panel to 10 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 12 wall is now installed FINISH 2 5 1 cm x27 1 1 2 3 8 cm x13 2 5 1 cm x2 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails Flush 6 15 2 cm 6 15 2 cm 2 5 1 cm Screw Fig B 2 5 1 cm Screw Fig A Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig C Secure wall top plate with 1...

Page 26: ...or frame with 2 nails spaced 6 apart Angle nails into floor frame Fig C Secure wall bottom plates to floor with 3 nails Fig C 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screw Fig D 6 15 2 cm Secure wall with 1 2 screw through eave wall panel into 10 wall bottom and top plates Fig B Fig A Secure wall to bottom plate first ENSURE PANEL CORNERS ARE FLUSH 2 BEGIN 1 Place 2nd 10 wall centered on floor 1 1 2 ...

Page 27: ...or frame Fig C Nail panels to 10 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH 2 5 1 cm x15 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS REQUIRED 2 5 1 cm Nails 1 1 2 3 8 cm Nails Flush Flush 6 15 2 cm 6 15 2 cm Fig A Secure wall top plates with 3 screws at each corner at an angle Fig D 3 3 7 6 cm Screw Fig D Fig B 3 7 6 cm Nails Nail 2 nails f...

Page 28: ...e from top with 2 3 nails spaced every 24 Fig A Your wall doublers are now installed FINISH Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP DOOR Ensure all doubler seams are non aligned over seams of wall top plates JBD TJ TJ SP TP SP TP 3 7 6 cm Nails JBD 2 x 4 x 20 3 8 5 1 x 10 2 x 51 8 cm x2 JBD 2 Secure from bottom wi...

Page 29: ...Secure gusset to rafters with 2 nails following the pattern shown FIg A Place 2 rafter halves AD in the corner of back and side walls flush to panels and studs STEP 1 Flush rafters at peak Secure gusset to rafters with 2 nails following the pattern shown FIg A BEGIN 1 2 3 Flip over rafter assembly and fasten second gusset to other side with 2 nails FIg C Temporary support OO Flush at peak 120 304 ...

Page 30: ...l studs Check that you have the measurements shown Secure rafters with 2 3 screws angled at each end Fig A Fig B Secure rafters on opposite side 1 FINISH Your rafters are now installed BEGIN Rafter with ONE GUSSET facing inward Two Gusset Preassembled One Gusset Preassembled 3 7 6 cm x5 x2 x28 Flush to outside of panel Flush to outside of panel Rafter with ONE GUSSET facing inward Fig A 3 7 6 cm S...

Page 31: ...e flat side as shown Measure and mark the center of the middle gable panel Secure with 1 1 2 nails spaced 6 apart along edge Place left panel on AF flush to installed gable panel and secure with 1 1 2 nails spaced 6 apart along edge Repeat step 2 for right panel Repeat all steps to build 1 additional gable unit 1 BEGIN 1 1 2 3 8cm x24 1 1 2 3 8cm Nails Flush Flush Install gable panels with the pri...

Page 32: ...ure and Mark Fig A 3 7 6 cm Screws Continue nailing lower edge of panels to wall doubler with 2 nails spaced 6 apart Continue securing panels to rafter with 2 nails spaced 6 apart Working inside secure gable unit with 2 3 screws angled into each AF at an angle Fig A Measure 2 1 2 down from top plate doubler and mark at each side as shown Set gable unit on top plate Fasten with 1 2 nail on each sid...

Page 33: ...nel as a lever move the panel side to side until the top corner is flush to the peak Fig B and there is a 1 2 measurement on the gable end rafter Fig C Secure panel with 2 2 nails in the corners 2 Place the 48 x 96 panel on rafters with a 3 4 measurement on the rafter Fig A and the panel flush at the peak Fig B Secure panel with 2 2 nails in the corners Two Nails Two Nails 48 x 96 Flush at peak Fi...

Page 34: ...ils in the corners 3 4 5 PARTS REQUIRED 10 x 12 ROOF PANELS x12 2 5 1 cm Fig D Maintain spacing between the center of the rafters at the lower edge of the panels Fig D Secure panels with 1 2 nail into each rafter as shown Move to the top of the panel and keep spacing between the center of the rafters Secure panels with 1 2 nail into each rafter 7 16 x 48 x 96 1 1 x 121 9 x 243 8 cm x1 NOTE Measure...

Page 35: ...the rafter Fig A and flush to the installed panels Secure panels with 1 2 nail in each corner 6 PARTS REQUIRED 10 x 12 ROOF PANELS x8 2 5 1 cm 2 5 1 cm Nails 23 1 2 x 96 23 1 2 x 48 3 4 1 9 cm Fig A Gauge Block Flush Flush Flush x1 x1 23 1 2 x 96 59 7 x 243 8 cm 23 1 2 x 47 7 8 59 7 x 121 9 cm ...

Page 36: ...alled Repeat STEPS to install roof panels on the opposite side FINISH Secure all roof panels with 2 nails spaced 6 apart and 12 apart inside of the 48 wide panels 7 PARTS REQUIRED 10 x 12 ROOF PANELS 2 5 1 cm 6 15 2 cm 12 30 5 cm x136 ...

Page 37: ...s now installed Install front gable trim AUR and AUL flush to top of roof panel and flush at peak as shown Fig A Secure trim with 2 finishing nails 7 1 4 apart BEGIN 1 Repeat above steps to secure the back wall gable trim FINISH 19 32 x 3 1 2 x 71 15 16 1 5 x 8 9 x 182 7 cm x2 AUR 19 32 x 3 1 2 x 71 15 16 1 5 x 8 9 x 182 7 cm x2 AUL ...

Page 38: ...x 15 2 x 126 4 cm WTC 2 Place VX eave trim flush along edge of roof panel Fig A BEGIN Repeat installation on opposite side Screw through roof panel into VX with 1 1 4 screws spaced approximately 7 1 2 apart as shown Screw through roof panel into AS with 1 1 4 screws spaced approximately 7 1 2 apart as shown Part WTC may need to be trimmed to fit Install WTC flush to edge of roof panel and flush to...

Page 39: ...gable panel Flush to eave soffit 83 1 2 83 1 2 212 1 cm Fig B Install gable end 83 1 2 corner trim under gable panel Fig A and flush to eave wall panel Fig B Secure with 2 finishing nails spaced evenly Install eave side 83 1 2 corner trim flush to eave soffit and flush along seam of installed corner trim Fig C Secure with 2 finishing nails spaced evenly 2 BEGIN 1 Flush to eave panel 3 8 x 1 3 4 x ...

Page 40: ...ed pattern Turn assembled joist over and repeat staggered nail pattern Support joist and drill a 7 16 hole through each end Fig A PARTS REQUIRED LOFT JOIST ASSEMBLY x48 3 7 6 cm x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 2 x 4 x 24 5 1 x 10 2 x 61 cm RL x4 7 16 11 mm Drill Bit Orient parts TP and RL on a flat surface Hold parts TP and RL flush and aligned BEGIN 1 Fig A Flush 3 7 6 cm Nails ...

Page 41: ...and flush to wall panel Secure PYA and AO with 6 3 screws angled as shown and with 2 3 nails into the right side of AO Predrill all screw holes with 5 16 bit 10 WALL 3 7 6 cm Nails PT LW AO AO AO PYA AO PYA Flush Flush 2 x 3 x 96 5 1 x 7 6 x 243 8 cm x1 PT 2 x 4 x 22 1 2 5 1 x 10 2 x 57 1 cm x2 AO 2 x 3 x 23 7 8 5 x 7 6 x 60 6 cm x1 LW 2 x 4 x 19 3 4 5 1 x 10 2 x 50 2 cm x1 PYA FINISH Your loft su...

Page 42: ...g D and at the measurement shown from the stud Fig C Secure with 3 screws screws angled up into top plate on the window side Fig C At the back wall side Fig D secure joist with 1 3 screw angled into the top plates and 2 3 screws through stud Predrill screw holes with 5 16 bit 2 BACK WALL BACK WALL Front JOIST Front JOIST 2nd JOIST FINISH Your loft joists are now installed 2 3 7 6 cm Nails Flush to...

Page 43: ...level Secure with 2 3 nails 2 x5 LR 2 1 2 6 35 cm 19 48 cm Flush Flush 4 7 16 11 3 cm LEVEL LR 7 16 11 mm 11 5 8 29 5 cm Flush x2 3 7 6 cm x20 BEGIN Assemble 5 workbench brackets Install brackets flush to end of LR Secure brackets to LR with 4 2 nails 1 2 5 1 cm 2 x 3 x 19 5 1 x 7 6 x 48 3 cm x6 LR 14 1 4 x 22 1 4 36 x 56 5 cm x5 ...

Page 44: ...ARTS REQUIRED WORKBENCH Install 5 bench brackets at measurement shown from floor level and flush to wall studs Fig A Secure with 2 nails 3 Flush Flush FLOOR x15 2 5 1 cm 2 5 1 cm Nails LEVEL Fig A 36 1 2 84 5 cm ...

Page 45: ...1 3 screw x34 2 5 1 cm Fig B Flush 2 5 1 cm Nails 1 x 4 x 96 2 5 x 10 2 x 243 9 cm x1 KP 1 x 4 x 20 1 2 2 5 x 10 2 x 52 1 cm x1 BA 4 Flush Flush Flush 19 1 2 x 92 1 2 19 1 2 x 23 7 8 2 5 1 cm Nails Install 19 1 2 x 92 1 2 and 19 1 2 x 23 7 8 bench panels across bench supports flush at seam and flush to wall studs Secure with 3 2 nails in each bench support 19 1 2 x 23 7 8 49 5 x 60 6 cm x1 19 1 2 ...

Page 46: ...ough holes in pegboard as shown Install bench backer boards BE and BC flush to bench top Secure with 2 2 nails x35 2 5 1 cm 1 x 3 x 23 78 2 5 x 7 6 x 60 6 cm x1 BC x1 23 7 8 x 96 1 1 x 60 6 x 243 9 cm PEGBOARD x1 23 7 8 x 23 7 8 60 6 x 60 6 cm 1 x 3 x 96 2 5 x 7 6 x 243 9 cm x1 BE PEGBOARD Flush 23 7 8 96 Flush 2 BEGIN 1 ...

Page 47: ...ce Secure parts with 2 nails as shown x14 2 5 1 cm 1 x 3 x 23 78 2 5 x 7 6 x 60 6 cm x1 BC 1 x 3 x 96 2 5 x 7 6 x 243 9 cm x1 BE 2 BEGIN 1 Install shelf frame flush along the top of pegboard Secure with 2 3 nails to studs angled in each support AC Flush Flush 3 7 6 cm Nails 2 x 3 x 10 5 1 x 7 6 x 25 4 cm x6 AC x12 3 7 6 cm ...

Page 48: ...AC with 1 3 screw 3 Install 11 1 2 x 23 7 8 and 11 1 2 x 96 bench panels across shelf frame flush at seam and flush to wall studs Secure with 2 1 1 4 screws in each support AC Maintain 24 61 cm between supports Flush at seam 3 7 6 cm x1 1 x 4 x 96 2 5 x 10 2 x 243 9 cm x1 KP 7 16 x 11 1 2 x 23 7 8 1 1 x 29 2 x 60 6 cm x1 7 16 x 11 1 2 x 96 1 1 x 29 2 x 243 9 cm x1 1 x 4 x 23 78 2 5 x 10 2 x 60 6 c...

Page 49: ... step 5 to secure right side shelf support to the back wall x6 2 5 1 cm Fig D 5 Reinforce left shelf support from outside Working outside measure according to the diagram Fig D and mark location of the shelf support Secure with 3 2 nails 15 38 1 cm 64 7 8 164 8 cm Bottom edge of wall panel ...

Page 50: ...lled Install loft panels centered over loft joists and ledger board Secure with 2 nails spaced evenly approximately 12 apart Note There will be a 1 2 gap either side of the loft deck x36 2 5 1 cm Flush 2 5 1 cm Nails Flush x1 x1 36 x 23 7 8 40 3 x 60 6 cm 36 x 96 60 6 x 244 cm ...

Page 51: ... 4 3 2 cm Screws PARTS REQUIRED x1 x1 Left Door Right Door DOORS 3 7 6 cm x4 1 x 3 x 5 2 5 x 7 6 x 12 7 cm x1 GAA x2 1 1 4 3 2 cm Place doors on flat surface 3 8 offset is to top Look for red right and green left on hinge board Attach temporary supports OO and GAA as shown BEGIN 1 OO x1 69 175 3 cm Door Stiffener ...

Page 52: ...mark 3 8 1 cm Fig B 3 7 6 cm x12 Flush against wall panels Fig A OO 2 3 Screw hinge boards into wall supports with 10 3 screws as shown Make sure screws go into framing 4 Install OO flush under panels Secure to floor frame with 2 3 screws Fig A Mark center of door opening OO x1 69 175 3 cm Door Stiffener 5 3 7 6 cm Screws in door stud 2 3 7 6 cm Screws OO TEMPORARY SUPPORT TEMPORARY SUPPORT ...

Page 53: ...g B OO IT IS IMPORTANT TO HOLD THESE DIMENSIONS 12 30 5 cm Approx BEGIN Center OO vertically on the left door in the doorway Fig A overlapping 1 2 5 cm along the edge of door Fig B Secure with 7 2 screws through outside trim into OO 1 Center OO vertically on the right door in the door opening offset 1 2 5 cm from the edge of door Fig B Secure with 7 2 screws through outside trim into OO 2 2 5 1 cm...

Page 54: ... and metal threshold are now installed FINISH Fig B 3 4 1 9 cm Screws AHR AHL AHR AHL AH AH ZJ 3 4 1 9 cm x11 Bagged separately special coating x1 AHL 19 32 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm x1 AHR 19 32 x 2 1 2 x 62 1 5 x 6 3 x 157 5 cm 19 32 x 2 1 2 x 26 5 8 1 5 x 6 3 x 67 6 cm AH x2 x1 ZJ 19 32 x 2 1 2 x 72 1 5 x 7 6 x 182 9 cm Install 64 metal threshold with 11 3 4 screws 3 3 4 1 9 cm x62 x1 6...

Page 55: ...GIN 1 PARTS REQUIRED DOOR HARDWARE Your decorative door hinges are now installed Install decorative hinges in locations shown Secure with 3 4 screws FINISH 3 4 1 9 cm Screws x4 3 4 1 9 cm x12 Flush to hinge ...

Page 56: ... when loop is connecting base Fig B Mark and pre drill holes for screws Install bolt with screws supplied Drill 5 16 7 9 mm hole deep enough for bolt to slide into Your spring bolts are now installed FINISH 5 16 7 9 mm drill for bolt 1 2 5 cm deep 5 16 7 9 mm drill for bolt 1 2 5 cm deep 1 2 12 7 mm OPEN POSITION Spring is loose OVER DOOR FRAME FLOOR Loop contacts base Loop contacts base OPEN POSI...

Page 57: ... set screw as shown 3 4 Insert handle in hole and secure with 1 1 4 screws FINISH RIGHT DOOR 1 3 4 4 4 cm TOP VIEW 1 4 Pre drill and 3 8 Drill through x1 x2 1 1 2 3 8 cm Re drill hole with 3 8 drill Keep drilled hole square to trim to avoid breaking edge of door stiffener Measure and mark location of hole on outside of right door as shown Fig A Pre drill hole with 1 4 drill Fig A 35 3 4 90 cm 1 3 ...

Page 58: ... have finished building your window shutters Proceed to install your window 2 2 Secure slats AZ with 1 screws Secure DF with 1 screws DF BWL BWR AZ x3 AZ x3 Flush Flush Flush Flush Flush Flush 1 4 3 8 cm 1 4 3 8 cm 2 1 2 6 3 cm 2 1 2 6 3 cm Primed side down Primed side down Primed side down You will build one left shutter and one right shutter Fig A LEFT SHUTTER LEFT SHUTTER RIGHT SHUTTER RIGHT SH...

Page 59: ...with high quality exterior grade caulk before installing Fig A 2 3 Install window with 4 1 1 4 screws as shown Ensure window is level Mark center of window frame as shown Window 22 1 2 x 29 3 4 57 1 x 75 6 cm x1 x4 WINDOW SHUTTERS BEGIN 1 Caulk behind frame near edge Fig A ...

Page 60: ...eat steps to install shutter on opposite side Locate DT centered on mark and flush to shutters as shown Install with 2 finishing nails Nail into window frame inside Your window and shutters are now installed x20 2 5 cm 19 32 x 2 1 2 x 28 1 8 1 5 x 7 6 x 71 4 cm x2 DT x1 x1 WINDOW SHUTTERS DT DT Flush Flush Flush 2 5 1 cm Finishing nails Flush CENTER Mark 3 4 Screws from inside Mark CENTER CENTER C...

Page 61: ...7 6 cm Nails Flush to panel Flush to panel x1 TM 2 x 4 x 72 5 1 x 10 2 x 182 9 cm x6 3 7 6 cm 1 BEGIN Install collar tie TM to the 3rd rafter from the front with 3 3 nails at each end COLLAR TIE HINT For best appearance install collar tie on back side of rafter 3rd ...

Page 62: ... EYE PARTS REQUIRED x2 Install hook into framing if possible BEGIN 1 FINISH Swing door open to locate eye Install hooks in wall and into framing behind Fig A You have installed your hook eyes 2 Hook Fig A Eye ...

Page 63: ... vents in side walls as shown 1 at top and 1 at bottom Cut out marked openings Caulk behind vent flanges Secure with 1 2 screws 1 Your vents are now installed FINISH 16 x 8 x2 1 2 13 mm x12 6 15 2 cm 3 5 7 6 12 7 cm 14 35 6 cm 1 2 Screws 1 3 cm 1 2 Screws 1 3 cm 14 35 6 cm 6 15 2 cm 5 12 7 cm 7 8 17 8 20 3 cm Caulk Caulk ...

Page 64: ... Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails to hold in place OK to overlap at ridge 3 OVERLAP Flush Flush Install drip edge over roof felt on gable side and under roof felt on eave side Fig A Do not use nails on side of drip edge that hangs o...

Page 65: ...cross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or flush with drip edge 4 Nails BACK OF SHED FRONT OF SHED NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS Familiarize yourself with a 3 Tab Shingle SHINGLE NAIL PATTERN 1 2 5 cm NAILS Sealing...

Page 66: ...Roof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row 3 Bend in roof 1 2 5 cm 1 2 5 cm BACK OF SHED FRONT OF SHED FRONT OF SHED Flush with rain slots Flush with rain slots Notch Notch ...

Page 67: ... 5 to rain slot you must install another row of shingles 5 12 7 cm or less 5 12 7 cm MAX Top of rain slot Cut Off You have finished shingling your roof Proceed to capping the ridge FINISH Repeat steps 1 7 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut s...

Page 68: ...ed cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED Flush 10x12 Note You will need about 30 32 cut pieces for 10 x 12 model 30 to 32 Pieces ...

Page 69: ... 4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge cap FINISH Cut at top of rain slot Flush to shingles Trim cap off fush to shingles Cap 4 10 2 cm ...

Page 70: ...eg Board A 1 4 x 23 7 8 x 96 A 96002314000 1 Peg Board B 1 4 x 23 7 8 x 23 7 8 A 23142314000 1 GUSSETS Gusset EZ8 OSB 6 X 24 GUSSET 22 5 J 24000600225 12 Center Gable Panel 3 8 NG 23 7 8 X 23 9 16 K 23092314000 2 Front Rear Gable Panel Right 3 8 NG 23 9 16 X 48 RIGHT FRONT GABLE K 48002309100 2 Front Rear Gable Panel Left 3 8 NG 23 9 16 X 48 LEFT FRONT GABLE K 48002309200 2 Corner Trim 3 8 NG 1 3 ...

Page 71: ... siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative an exterior oil based semi transparent st...