![Heartland 16615-G Assembly Manual Download Page 41](http://html.mh-extra.com/html/heartland/16615-g/16615-g_assembly-manual_2114815041.webp)
39
3" (7,6 cm)
x8
BEGIN
¸
1
PARTS REQUIRED:
LOFT SUPPORTS
x18
3" (7,6 cm)
Flush
at seam
Install
LW
and
PT
fl ush to bottom of top plate and fl ush at seam.
Secure with (2) 3" nails at wall studs and (4) 3" nails at seam.
2
Install loft support
AO
above window at measurement shown to top plate
(Fig. A)
and fl ush to wall panel.
Secure with (2) 3" screws angled into
AO
on window side, and with (2) 3" nails on the back wall side.
Predrill screw holes with 5/16" bit.
3
Install loft supports
PYA
and
AO
to back wall at measurement shown to top plate
(Fig. B)
and fl ush to wall panel.
Secure
PYA
and
AO
with (6) 3" screws angled, as shown, and with (2) 3" nails into the right side of
AO
.
Predrill all screw holes with 5/16" bit.
10' WALL
3" (7,6 cm)
Nails
PT
LW
AO
AO
AO
PYA
AO
PYA
Flush
Flush
2 x 3 x 96" (5,1 x 7,6 x 243,8 cm)
x1
PT
2 x 4 x 22-1/2"
(5,1 x 10,2 x 57,1 cm)
x2 AO
2 x 3 x 23-7/8”
5 x 7,6 x 60,6 cm
x1 LW
2 x 4 x 19-3/4"
(5,1 x 10,2 x 50,2 cm)
x1 PYA
FINISH
Your loft supports are now installed.
(2) 3"
(7,6 cm)
Nails
(2) 3"
(7,6 cm)
Nails
(2) 3"
(7,6 cm)
Nails
(2) 3"
(7,6 cm)
Screws
(2) 3"
(7,6 cm)
Screws
(2) 3"
(7,6 cm)
Screws
(2) 3"
(7,6 cm)
Screws
(2) 3"
(7,6 cm)
Nails
(2) 3"
(7,6 cm)
Screws
3-1/2" (8,9 cm)
3-1/2"
(8,9 cm)
3-1/2"
(8,9 cm)
(6) 3"
(7,6 cm)
Screws
Fig. A
Fig. B
Window
5/16" (7,9 mm) Drill Bit
Flush AO and PYA to wall panel.
3-1/2”
(8,9 cm)