48
BEGIN
¸
1
PARTS REQUIRED:
LOFT PANELS
FINISH
Your loft panels are now installed.
Install loft panels centered over loft joists and ledger board.
Secure with 2" nails spaced evenly (approximately 12" apart).
Note:
There will be a 1/2" gap either side of the loft deck.
x36
2" (5,1 cm)
Flush
2"
(5,1 cm)
Nails
Flush
x1
x1
36" x 23-7/8" (40,3 x 60,6 cm)
36" x 96" (60,6 x 244 cm)