26
20-3/8"
92-5/8"
48"
96"
20-3/8"
92-5/8"
(51,8 cm)
24"
Nail TYP.
(61 cm)
(235,3 cm)
96"
48"
(51,8 cm)
(235,3 cm)
(121,9 cm)
(243,8 cm)
(243,8 cm)
(121,9 cm)
10' x 12' WALL DOUBLERS INSTALLATION
3" (7,6 cm)
x64
3" (7,6 cm)
x8
PARTS REQUIRED:
1
BEGIN
Orient parts on top of wall frames. Secure from top with (2) 3" nails spaced every 24"
(Fig. A).
Your wall doublers are now installed.
FINISH
Fig. A
x2
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
TJ
x2
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
TP
x2
2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
SP
DOOR
Ensure all doubler seams are non-aligned
over seams of wall top plates.
JBD
TJ
TJ
SP
TP
SP
TP
3" (7,6) cm
Nails
JBD
2 x 4 x 20-3/8" (5,1 x 10,2 x 51,8 cm)
x2 JBD
2
Secure from bottom with (2) 3" screws at each corner
(Fig. B).
Fig. B
3" (7,6) cm
Screws