22
07/22
7027-804H
2 screws into
back of hopper
1 screw down
into filler piece
Figure 22.1
Figure 22.2
Figure 22.3
Figure 22.4
6 screws to attach
rear panel
8 screws to attach
left shroud panel
Figure 22.5
Figure 22.6
3 screws to attach right shroud
panel to right shroud corner piece
5 screws to attach
right shroud panel
Drill these 2
holes
Figure 22.8
Figure 22.7
Drill these 3
holes
4. Install the left shroud panel corner; 2 screws into
back of hopper and 1 screw down into the filler
piece
(Figure 22.1)
.
5. Install the Rear Panel using six screws
(Figure 22.2)
.
6. Install the cover plate over the top vent opening using 4
screws
(Figure 22.3)
.
7. Attach the left shroud panel using eight
screws
(Figure 22.4)
.
8. Assemble the right shroud panel corner and the right
shroud panel using 3 screws
(Figure 22.5)
.
9. Attach the right panel assembly using 4 screws to
appliance
(Figure 22.6)
.
10. Using the electric drill with #26 drill bit; drill 3 holes
into the hopper. Add three screws to secure shroud
assembly to the appliance
(Figure 22.7)
.
11. Using the electric drill with #26 drill bit; drill 2 holes
into the back of the hopper. Add two screws to secure
shroud assembly to the appliance
(Figure 22.8)
.
Summary of Contents for Quadra-Fire CB1200
Page 31: ...31 07 22 7027 804H...