4 Planning and installation – Installing the heating system
34
7.
Mount the right container cladding (2) to the side of the reservoir
on the 2nd and 3rd hole (1) from the top with the Torx screws.
8.
Mount the right container cladding (2) to the front of the reservoir
with the Torx screws.
3.
Place the upper cladding (1)
above the water tank onto the
boiler.
4.
Mount the upper cladding (1)
with the Phillips screws.
Figure 4/24 - Installing the upper cladding
1
5.
Push the middle orifice plate
(1) under the cladding or
sideways into the recesses on
the boiler.
6.
Fasten the middle orifice
plate (1) with the Phillips
screws (2).
Figure 4/25 - Mounting the middle orifice plate
1
2
Figure 4/26 - Mounting the right container cladding
2
1
9.
Mount the lower front
cladding (1) with the coated
Torx screws on the middle
orifice plate and the left
container cladding.
Figure 4/27 - Installing the front cladding at the bottom
1