4 Planning and installation – Installing the heating system
28
W
ITH
A
SACK
TRUCK
5.
Lay the ratchet strap (1) around the star-grip screw (2) on the
cleaning shaft lid.
6.
Fasten the ratchet strap (1) to the sack truck.
7.
Lift the boiler (3) off the pallet with the sack truck.
B
Y
CRANE
8.
Remove the star-grip screw (2) from the cleaning shaft lid.
9.
Screw an M12 crane eyelet (1) (not supplied) into the threaded
pin.
10.
Lift the boiler (3) off the pallet by crane.
✓
The transport pallet has been removed.
I
NSTALLING
THE
BOILER
1.
Place the boiler in the planned location.
2.
Ensure the minimum clearances.
✎
See section “4.1 Planning the heating system”, under “Required
room sizes and minimum clearances”.
Figure 4/8 - Removing the transport pallet using a sack truck
2
3
1
Figure 4/9 - Removing the transport pallet using a crane
2
3
1