6 Using the heating system – Filling the reservoir
44
5.
Inform the tanker driver that the pellet storage room can be filled.
6.
After filling is completed, close the injection and extraction
nozzles.
7.
Close the reservoir inspection hatch.
9.
Switch the heating system on.
✎
See the “HDG Control” operating manual, chapter “5 Using the
control unit”, section “5.2 Switching on the heating system”.
✓
The filling of the pellet storage is completed.
6.3 Filling the reservoir
M
ANUAL
FILLING
When operating without an automatic pellet suction system, the
reservoir is manually filled.
1.
Open the reservoir cover.
2.
Fill the reservoir with pellets up to a maximum of 1 cm below the
rim.
✓
The reservoir is filled.
P
ELLET
SUCTION
SYSTEM
The reservoir is filled by the automatic pellet suction system. Initial
filling is performed during commissioning of the system. Each further
filling is automatic as required by the boiler control system.
6.4 Performing a chimney sweep measurement
✎
See the “HDG Control” operating manual, chapter “5 Using the
control unit”, section “5.8 Performing a chimney sweep
measurement”.
8.
Document the filling of the
storage room on the “Filling
the fuel storage room” sticker.
Figure 6/2 - Filling the fuel storage room
002357/00
01/2010
Befüllung Lagerraum
Filling date and volume
Remplissage du silo de stockage
Datum/Date/Date
Menge/Volume/Quantité
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg