Cylinder inspection
MS0003
3.3 - MAJOR INSPECTION
A thorough inspection of the structural parts must be realized all the 5000 h or 10 years with disassembling
of the element to check the entirety of the welding. Each Cylinder must be disassembled and must be review
using non-destructive checks.
The criteria quoted above are applicable :
• Absence of deformation and visible damage.
• Absence of crack, broken welding, oxidation, glare of painting.
Check :
1.
Pipe weld connection.
2.
Rod weld connection.
3.
Ring.
4.
Rod.
5.
Piston.
Summary of Contents for STAR 13 P
Page 2: ...2 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P...
Page 10: ...10 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P A Preface Foreword Notes...
Page 19: ...19 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P C Familiarization Notes Familiarization...
Page 68: ...68 4000562980 E 07 16 USA GB General data Breaking test procedure MS0004 Notes...
Page 74: ...74 4000562980 E 07 16 USA GB Electric Electrical wiring MS0059 Notes...
Page 80: ...80 4000562980 E 07 16 USA GB Chassis Tires Tyres Wheel replacement MS0102 Notes...
Page 100: ...100 4000562980 E 07 16 USA GB Chassis Pothole cylinder replacement MS0087 Notes...
Page 104: ...104 4000562980 E 07 16 USA GB Picking tray chain Control Lubrication MS0112 Notes...
Page 118: ...118 4000562980 E 07 16 USA GB Ground control box HAULOTTE Activ Screen MS0106 Notes...
Page 130: ...130 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P E Trouble shooting and diagram Notes...