57
4000562980
E 07.16
USA / GB
General data
Structural part inspection
MS0001
3.2 - MAJOR INSPECTION
A thorough inspection of the structural parts must be realized all the 5000 h or 10 years with disassembling
of the element to check the entirety of the welding. All structural part listed Section Familiarization must be
disassembled and all weldsmust be review using non-destructive checks.
The criteria quoted above are applicable.
The main items to be inspected are :
• Boss welds on chassis, turret, arms, booms and jib.
• Booms and arms welds.
E x a m p l e
In the event of suspicion of crack, a cleaning and a sweating are to be carried out to guarantee the integrity
of the part before reassembly.
Check presence and torque of each bolts and screw used to assembly part listed in Section Familiarization.
Refer to spare part catalog for additional information if needed.
Some screws are not reusable and must be systematically changed (ex: screws from the gear ring).
Summary of Contents for STAR 13 P
Page 2: ...2 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P...
Page 10: ...10 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P A Preface Foreword Notes...
Page 19: ...19 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P C Familiarization Notes Familiarization...
Page 68: ...68 4000562980 E 07 16 USA GB General data Breaking test procedure MS0004 Notes...
Page 74: ...74 4000562980 E 07 16 USA GB Electric Electrical wiring MS0059 Notes...
Page 80: ...80 4000562980 E 07 16 USA GB Chassis Tires Tyres Wheel replacement MS0102 Notes...
Page 100: ...100 4000562980 E 07 16 USA GB Chassis Pothole cylinder replacement MS0087 Notes...
Page 104: ...104 4000562980 E 07 16 USA GB Picking tray chain Control Lubrication MS0112 Notes...
Page 118: ...118 4000562980 E 07 16 USA GB Ground control box HAULOTTE Activ Screen MS0106 Notes...
Page 130: ...130 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P E Trouble shooting and diagram Notes...