2.
Lift the cover upward cover to disengage the battery.
3.
Remove the battery.
How to Test the ELD
1.
As supervisor (see
How to Log in as Supervisor
on page 202):
Press
and type 7.6 or select the path:
Maintenance
External Label Dispenser Management
The Test screen is displayed.
2.
Press
Begin ELD test
.
102
| Page 102 | jul-08-2013 06:34 |
3
Processing
Summary of Contents for IN750 Series
Page 1: ...IN750 Series MAILING SYSTEM USER S GUIDE...
Page 2: ...A0018952 B 09 09 2013...
Page 6: ......
Page 8: ......
Page 16: ......
Page 18: ......
Page 34: ......
Page 114: ...The Label Dispenser can hold up to 40 labels 108 3 Processing Mail...
Page 116: ......
Page 122: ......
Page 124: ......
Page 160: ......
Page 162: ......
Page 190: ......
Page 227: ...Geodesic map 8 Configuring your Mailing System 221...
Page 228: ...Geodesic codes 222 8 Configuring your Mailing System...
Page 246: ......
Page 262: ......
Page 264: ......
Page 284: ......
Page 298: ......
Page 305: ......
Page 306: ...A0018952 B 09 07 2013...