Q-Drive Installation, Operation, and Maintenance Manual
14 of 59
The filter needs to be @ 10 micron rating
Attaching Air, Gas, and Coolant Lines
Port
Connection
Port ID
Blow By
BULK 3/4" TUBE X 3/4" FEM NPT
1
Purge
BULK 1/4" TUBE X 1/4" FEM NPT
2
QGT Vent Lines (4)
BULK 3/8" TUBE X 3/8" FEM NPT
3
QGD Vent Lines (3)
Gas Outlet
BULK 1/2" TUBE X 1/2" FEM NPT
4
Gas Inlet
BULK 1/2" TUBE X 1/2" FEM NPT
5
Air Supply
STRAIGHT BULKHEAD 1/2" FEM NPT
6
Coolant Outlet
3/4" JIC37 BULK FEM
7
Coolant Inlet
3/4" JIC37 BULK FEM
8
Drain Hole
1/4" TUBE OD
9
Ports on the Rear Side
1
2
3
4
6
7
8
5
1 Blow By
2 Purge
3 Vent Lines
4 Gas Outlet
5 Gas Inlet
6 Air Supply
7 Coolant Outlet
8 Coolant Inlet
9 Drain Hole
9
1
Summary of Contents for Q-Drive QGD Series
Page 1: ...88544_A Q Drive Installation Operation and Maintenance Manual Model QGD and QGT ...
Page 57: ...Q Drive Installation Operation and Maintenance Manual 51 of 59 Points of Connections ...
Page 58: ...Q Drive Installation Operation and Maintenance Manual 52 of 59 ...
Page 59: ...Q Drive Installation Operation and Maintenance Manual 53 of 59 ...
Page 60: ...Q Drive Installation Operation and Maintenance Manual 54 of 59 ...
Page 61: ...Q Drive Installation Operation and Maintenance Manual 55 of 59 ...
Page 62: ...Q Drive Installation Operation and Maintenance Manual 56 of 59 ...