11
Preparing the Water Supply Trailer
The 720 Dew Simulator will require a water supply trailer (not included). The following step will explain the
installation of the supply, return fittings and hoses.
1.
Install the 2” bulkhead connector in the bottom of the tank. Then install the 2” elbow (003-EL2020) fitting in
the bulkhead.
2.
Attach the 2” hose (provided) to the 2” elbow fitting, route to front of trailer where the valve can be easily
accessed, cut hose to length,
and install 2” valve assembly. From the remaining 2” hose, cut a section to
length that will run from the 2” valve assembly to rear of the machine. Install the 2” coupler fitting and
connect to the machine. Ensure hose is free to move when turning both directions with the machine.
Sec
ure all connections with 2” hose clamps.
3. Install 1/2
” stainless steel bulkhead
in bottom of the tank, or front side towards the bottom of tank. Install
the steel
1/2” NPT x 3/4” Elbow (003-DSEL1234) and black green stripe hose. Route hose to rear of Dew
Simulator, cut hose to length, then attach to the aluminum coupler (002-2204B).
Locate the ¾” On/Off
valve with hose barb fittings and attach to green stripe hose in an accessible location between the coupler
at the hitch and fitting at the bottom of the tank. Secure the green stripe hose to each fitting with the
provided hose clamps. *Note that water returning to the tank through this line will approach 200 F.
Summary of Contents for 720 Dew Simulator
Page 2: ...2 intentionally blank...
Page 7: ...7 Safety Decal Locations...
Page 69: ...69 Notes...
Page 70: ...70 Notes...