Propeller Owner’s Manual
115N
INSPECTION AND CHECK
61-00-15
Page 5-1
Rev. 24 Dec/20
INSPECTION AND CHECK - CONTENTS
1. Pre-Flight Checks ....................................................................... 5-3
A. Important Information ............................................................ 5-3
B Propeller Blades ................................................................... 5-3
C. Spinner Assembly and Blade Retention Components .......... 5-4
D. Hardware .............................................................................. 5-4
E. Grease/Oil Leakage .............................................................. 5-4
F. Initial Run-Up ........................................................................ 5-4
G. Additional Information ........................................................... 5-4
2. Post-Flight Checks ..................................................................... 5-5
A. HC-C2YR-2CLUF/FLC7666A-4 Propellers Installed
on OMA SUD Skycar Aircraft................................................ 5-5
3. Operational Checks .................................................................... 5-7
A. Initial Run-Up ........................................................................ 5-7
B Static RPM Check - for Reciprocating Applications ONLY.... 5-9
C. Propeller Ground Idle RPM Check - for Turbine
Applications ONLY .............................................................. 5-10
4. Required Periodic Inspections and Maintenance ..................... 5-15
A. Periodic Inspections ............................................................ 5-15
B Blade Inspection for an HC-C2YR-2CLUF/FLC7666A-4
Propeller Installed on OMA SUD Skycar Aircraft ............... 5-18
C. Spinner Bulkhead Inspection for an HC-E3YR-1RF
Propeller Installed on S.N.A. Inc. Seawind Aircraft. ........... 5-19
D. Low Pitch Stop Hardware Inspection for a
PHC-C3YF-2UF/FC7693DFB Propeller ............................. 5-19
E. Periodic Maintenance ......................................................... 5-20
F. Airworthiness Limitations .................................................... 5-21
G. Overhaul Periods ................................................................ 5-21
5. Inspection Procedures ............................................................. 5-22