
9
3-90-00674R20_08/12
NOTICE:
When removing the top and lid assembly,
first remove the hopper lid position switch from its
mounting bracket. Loosen the switch retainer nut,
and allow the switch to drop out of the bracket.
leave the bracket in place.
Top and Lid Assembly
Center
Medallion
Flame Guide
Heat
Exchanger
Cover
Ash Pan
(2) Spring Latches
(One on each side)
Fig. 11
Installation
1. Remove the top/lid assembly and side panels.
•
Note: removal of the cast hopper lid itself is NOT
necessary or recommended.
•
Note: The hopper lid must be in the "OPEN" position
before the top/lid assembly can be lifted off or reinstalled
on the stove body.
•
There are (4) 1/4-20 x 1/2" flange head bolts securing
the top/lid assembly to the stove body. They can be
removed from the underside with a 3/8" socket.
The cast top and lid assembly bolt down bars:
On each side of the stove body, underneath the cast
top, are (2) 1/4" flange head bolts. See Fig. 12.
These bolts pull the cast top and lid assembly down
onto the hopper gasket to seal the hopper.
They also allow for a small amount of front to back
adjustment for alignment of the top into the wing
pockets.
Internal
Cast Iron
(4) pieces
Mounting Shell
Protector Angles: These angles are designed
to protect the blower motor from damage when
placed on a flat surface. Be careful where and
how the stove body is handled.
Be careful not
to damage the
distribution blower
located under the
insert. There are
guards on both
sides of the motor
to allow the insert
to rest on a flat
surface, however,
extra care should
be taken.
Distribution Blower
bolts require a
3/8" socket.
(view looking up under the cast top.)
Top bolt down bar
Fig. 10
Fig. 12
how to reduce the weight for Installation