RevV4 Valves & Systems Service Manual
34
Hankscraft Runxin, LLC 300 Wengel Drive 608.524.9465 hrh2o.com [email protected]
3.
Assemble salt grid (4 feet, 1 base). Feet clip into the bottom of the base.
4.
Insert assembled salt grid into brine tank by lining up the cut out hole with
the drilled holes on the brine tank.
5.
Hold float and connected ABS tubing (at the bottom; securing the ABS tubing), turn the black nut
counterclockwise while the tubing is secured in place. Set to desired salt setting and retighten float nut.
Tank Size
Letter
Salt Level (See Fig. 4)
Salt Setting
9x48
To white tape or above
9 lbs.
10x44
Halfway between white/blue tape or above
~ 10.5 lbs.
10x54
To blue tape or above
12 lbs.
12x52
To green tape or above
15 lbs.
13x54
To green tape or above
> 15 lbs.
A
B
C
D
E
A
B
C
D
E