11
Figure 3b
General Layout Drawing
(Models 3200 through 4300)
TOP VIEW
OUTLET
CHECK VALVE
ASME RELIEF VALVE
DESICCANT
FILL PORT
LEFT TOWER
PRESSURE GAUGE
PRESSURE REGULATOR
& PILOT AIR FILTER
DEWPOINTER
(OPTIONAL)
TOWER PURGE
EXHAUST VALVE
FRONT VIEW
TOWER
DEPRESS VALVE
DESICCANT
DRAIN PORT
TOWER INSULATION
(OPTIONAL)
HIGH TENSION
ENCLOSURE
CONTROL
ENCLOSURE
RIGHT TOWER
PRESSURE GAUGE
PURGE PRESSURE
GAUGE
REPRESS
VALVE
PURGE BLOWER
AND MOTOR
PURGE BLOWER
THROTTLING VALVE
PURGE SUCTION
FILTER SILENCER
PURGE HEATER
WITH INSULATION
HEATER
OVERTEMP RTD
HOT PIPE
INSULATION
PURGE INLET
CHECK VALVE
TOWER
INLET VALVE
REAR VIEW
HEATER TEMP
THERMOCOUPLE
(CENTER END IN PIPE)
(OPPOSITE SIDE)
CHAMBER
BLOW-DOWN
VALVE
Summary of Contents for HBP Series
Page 43: ...43...