9
Hammer Engines GmbH / IQ-Series / Instruction Manual
Checklist for the first time of Operation of the IQ-Hammer turbine
Install and connect the components according to the installation plan (see page
14). Pay special attention to the correct connection of the FUEL valve and to a
proper plumbing of the tubes without kinking them. The arrow on the fuel pump
and the valve indicate the flow direction of the fuel to the engine.
The QS quick connectors (blue) should snap in when you plug in the tube. The
tube can only be released by pressing on the blue ring while pulling the tube out.
Only use approved PUN/ Festo tubes with a diameter of 4 mm (0.16") or 6mm
diameter (0.236”), respectively.
Charge all batteries, paying special attention to the correct charging program for
the lithium manganese battery, i.e. a maximum charging voltage of 12.6 V. Use
the 3s LiPo charging mode of your charger at 1 – 2 Amps.
Check the temperature sensor to the environment temperature via the parameter
Menu
→
2-ADJUSTMENTS
→
2.3 ADJUST TEMP
→
AMBIENT TEMP
Teach the remote control: OFF, IDLE, 100 %, via the menu
→
2 ADJUSTMENTS
→
2.1 LEARN RC TIMING
→
make adjustment