START-UP CHECKLIST
Before energizing the apparatus and Hale FoamMaster system for the first time make sure
the following items are checked:
Electrical
q
Tank level sensor(s) wires connected to distribution box and sealed from moisture.
q
Tank level sensor(s) function properly.
q
Control cable connection at distribution box correct and tight.
q
Flowsensor cable properly connected to control unit or foam discharge multiplexing
display unit.
q
All cables and wires are secured and protected from damage during operation.
q
Control and flowsensor cables properly folded and secured; radio antennas, power
lines and equipment away from cables.
q
Foam Pump and motor assembly properly grounded using flat ground strap.
q
Correct voltage provided. Direct current, negative ground.
q
Adequate current, 60 AMPS minimum, available. Main power direct to battery, battery
switch or solenoid without primer or other accessories tied in.
q
Primary electrical and ground connections tight and protected from corrosion with
silicone sealant.
q
Splices in wires sealed from moisture using adhesive filled heat shrink tubing.
q
Hale FoamMaster system ON/OFF switch on the distribution box is in the ON position.
q
If installed, ADT, MST or MDT
ΙΙ
electrical connections correct.
q
If installed, Remote ON/OFF switch cable connection correct.
Liquid
q
Flowsensor(s) mounted with flow arrow in the correct direction for water flow.
q
Check valves are properly mounted in water and foam concentrate lines.
q
Strainer mounted for proper concentrate flow direction in foam tank to pump hose.
q
Foam tank to foam pump valve is in place and open.
q
Check valve/injector fitting lines are proper size and connections are tight.
q
BYPASS valve is properly mounted and oriented for direction of concentrate flow.
q
Foam concentrate gravity feeds to foam pump from foam concentrate tank.
q
All hoses free of kinks and sharp bends.
q
No sharp bends that can trap air exist in system.
q
MST positioned to
FOAM TANK
or MDT
ΙΙ
positioned to
TANK A
.
q
Flush water connections correct and tight.
q
Discharge piping hydro tested in accordance with NFPA/UL requirements.
q
Bypass valve handle is in the INJECT position.
Foam Pump
q
Foam pump and motor assembly mounted in horizontal position with base plate down.
q
Foam pump and motor assembly properly secured using proper mounting hardware.
q
Foam pump suction and discharge hoses connected to proper ports.
q
Foam pump suction and discharge hose fittings tight.
Optional ADT
q
Panel placard mounted on operator panel.
q
Air hoses connected and connections tight.
q
Selector switch is in the
TANK A
position.
q
Bypass handle is in the INJECT position.