Connect the drain line
The sample waste from the instrument must be collected in a compatible
waste container. Monitor the liquid level in the waste container to prevent
overflow. Dispose of waste in accordance with local, state and national
environmental regulations.
Install or remove the docking module
Docking modules are available for single or multiple-container sampling.
Install the small-vial clamp
The optional small-vial clamp connects to the docking module with 2
screws.
Connect the power cord
A power supply unit is used to supply power to the instrument.
Remove the magnetic stirrer
The magnetic stirrer in the docking module can be removed if necessary.
English
13
Summary of Contents for LANGE HIAC 9703+
Page 2: ...English 3 Deutsch 20 Italiano 37 Fran ais 54 Espa ol 71 2...
Page 9: ...1 2 3 4 English 9...
Page 10: ...5 7 6 10 English...
Page 11: ...1 2 3 4 English 11...
Page 12: ...5 7 6 12 English...
Page 26: ...1 2 3 4 26 Deutsch...
Page 27: ...5 7 6 Deutsch 27...
Page 28: ...1 2 3 4 28 Deutsch...
Page 29: ...5 7 6 Deutsch 29...
Page 43: ...1 2 3 4 Italiano 43...
Page 44: ...5 7 6 44 Italiano...
Page 45: ...1 2 3 4 Italiano 45...
Page 46: ...5 7 6 46 Italiano...
Page 60: ...1 2 3 4 60 Fran ais...
Page 61: ...5 7 6 Fran ais 61...
Page 62: ...1 2 3 4 62 Fran ais...
Page 63: ...5 7 6 Fran ais 63...
Page 77: ...1 2 3 4 Espa ol 77...
Page 78: ...5 7 6 78 Espa ol...
Page 79: ...1 2 3 4 Espa ol 79...
Page 80: ...5 7 6 80 Espa ol...
Page 88: ...www hach lange com Hach Lange GmbH 2010 All rights reserved Printed in Germany...