Installation Manual
H3C S3100-52P Ethernet Switch
Chapter 4 Starting up the Switch at the Initial Boot
4-4
Figure 4-6
Settings tab
4.4 Booting the Switch
4.4.1 Verifying Installation before Power-up
Before powering up the switch, check that:
z
Both the power cord and the grounding wire are correctly connected.
z
Proper power supply is used.
z
The console cable is correctly connected.
z
The console terminal (or PC) has been started and the related parameters have
been set on it.
4.4.2 Powering up the Switch
Starting......
***********************************************************
* *
* H3C S3100-52P BOOTROM, Version 101 *
* *
***********************************************************
Copyright(c) 2004-2007 Hangzhou H3C Technologies Co., Ltd.