![H-KING DH82A TIGER MOTH Building Instructions Download Page 25](http://html1.mh-extra.com/html/h-king/dh82a-tiger-moth/dh82a-tiger-moth_building-instructions_3076984025.webp)
23
1. Identify all the metal parts, screws and nuts for the assembly of the main landing gear.
2. Assemble the parts in the sequence shown, starting
with the sprung oleo parts. Assemble these as shown
in the picture and lock each end with the nylon insert
nuts. Ensure that the sprung part stays movable.
3. Fix the sprung oleo to the axle with the provided screws.
J. Main landing gear assembly