2.6 Connection Inspection
Check the circuit connected with the FACP. Measure the insulation resistance between
loops and between loops and ground, which should be more than 20MΩ. Measure the
load of detection loops, which should be more than 1kΩ. The resistance between cables
of NAC1, NAC2 should be equal to the end-of-
line resistance (4.7kΩ). If NAC2/AUX is set
as AUX function, the resistance between cables should be equal to 1k
Ω.
For testing Ground Fault detection, maximum 50 ohms testing resistor is to be used.
2.7 Setup FACP and Define Devices
Refer to Section 4 for FACP programming and configuration.
2.8 Field Device Commission
After connection, definition and download of device and C&E equations, you can power
up the FACP and start commission. The following steps are for reference.
1
Complete the labels of zone indication panel.
2
Test all the detectors and make sure their positions are correct.
3
Check all device definition, and modify the improper definitions.
4
Check all C&E equations, modify improper equations, and test automatic action of the
system by C&E equation.