![GSI Group PNEG-369 Owner'S Manual Download Page 61](http://html1.mh-extra.com/html/gsi-group/pneg-369/pneg-369_owners-manual_2275196061.webp)
61
24' Batch & Autoflow
Wall Mount Rotary Switch
TAF-6106
5
3
4
1
2
(inside bin)
4.00"
(inside bin)
2.66"
Figure #57
Key
Part No.
Description
Quantity
Weight
1
TD-100076
Rotary Switch Power-Pak
1
3.50
2
TD-100629
Roof Mount Coupling Weldment
1
2.14
3
TD-100075
Flex-Coupling
1
0.50
4
S-7241
1/8" x 1.1/4" Cotter Pin
2
0.02
5
TAF-6085
1-Vane Paddle
1
0.75
*
TAF-6097
Hardware Package
1
0.98
--
PNEG-300
Rotary Switch Instructions
1
0.04
--
S-275
5/16" - 18 x 3/4" Bin Bolt
6
0.16
--
S-3651
Tube Seal
1
0.74
--
S-396
5/16" - 18 Hex Nut
6
0.06
--
S-7241
1/8" x 1.1/4" Cotter Pin
2
0.02
INSTALLATION OF WALL-MOUNTED ROTARY SWITCHES
Note: Wall mounted switch must be located at least 3' below the fan opening.
Drill 2" hole through wall 3' below the upper fan and heating unit(s). IF BIN IS 2.66" corrugation, hole should
be centered on outside hill (see Figure #54 below) IF BIN IS 4.00" corrugation, hole should be centered on
outside valley.
Position mount plate (from inside), mark and drill 3/8" holes. Caulk coupling abundantly where it passes
through the wall. Add foam weather strip around top and sides of plate then bolt to bin wall. Caulk coupling
to wall from outside. Attach flex coupling to power-pak. Add teflon tape or pipe (sealant not included) to power-
pak pipe threads and thread into coupling. Conduit opening should be horizontal or down. Add one-vane paddle.
ROTARY SWITCHES