19
24' Batch & Autoflow
LOCATION OF ACCESSORIES
Below is a typical Top Dry bin layout showing suggested locations of Top Dry Accessories. When
locating the manway be sure the outside ladder will not interfere with other accessories below. Roof
vents should be spaced evenly around the roof. (Quantity will vary with individual systems.)
NOTE: The Top Dry system should be provided with a dependable equipment ground.
Aeration Fan &
Transition
Manual Winch
Outside Ladder
Unloading Auger
2 Ring Door
Top Dry
Control Center
Figure #8
Roof Vents
Crop Dryer
Platform
Top Dry
Crop Dryer Unit
Access Door
Platform
Manway