![GSI Group PNEG-369 Owner'S Manual Download Page 46](http://html1.mh-extra.com/html/gsi-group/pneg-369/pneg-369_owners-manual_2275196046.webp)
46
24' Batch & Autoflow
Chain leading to outer chutes (100")
Adjust length as required
TD-100205
Center Lift Plate
(TD-100801)
Chutes in closed position
Crimp "S" hooks after final
chute adjustment
Cable Clamp
S-4693
Loop in Cable
Figure #40
Center Collar
Cross Brace
Lift
Plate
To sidewall
pulley
assembly
12" when chutes are
level(closed)
Attach all 21 dump chute chains directly to the lift plate as shown in diagram below.
Install all chains using "S" hooks (S-4692) to attach the chains to the dump chutes and lift plates. Keep excess
chain at the lift plate. Adjust the chains until the chutes are approximately level when the lift plate is in the
closed (up) position. Once the chains are uniformly adjusted, crimp the "S" hooks closed. Check when
attaching the "S" hook to the end link on a chain that the end has not been cut open. If this is found remove
the end link or shift up and use the next link in chain. The lift plate should be approximately 12" down from
the cross channel when the chutes are level.
DUMP CHUTE CHAIN ASSEMBLY