24' Batch & Autoflow
WINCH ASSEMBLY
Complete erection of bin. Install winch as shown using 5/16" x 3/4" bin bolts to attach to the sidewall. The cable
clamps from either side of the pulley on the cross channel should be removed and the dump chutes pulled tightly
shut. Check for the uniformity of the chains on the dump chutes and readjust if needed. The downward travel of
the chutes must be limited to prevent damage on new Top Dry bins. This can be done after the bin is complete
and the cable stop bracket and clamp is set to indicate when the dump chutes are fully closed. Open the chutes
until the cable clamp is about 30" above the cable stop bracket. Attach another cable clamp just below the small
outside pulley bracket making sure it is tight.
30"
Sidewall
Cable clamp to
limit downward
travel of chutes
S-4691
Winch
TD-100041
Winch Mount Bracket
Cable clamp
Outside pulley
brackets
Cable stop
TD-100040
Winch Stop Bracket
Figure #41